OKS4DAQ meeting

US/Central
Description

Action plan:

Testing:

  • Continue testing the candidate release and ask Andrew/John to launch a new build if changes need to be included. At some point soon we should consolidate the release.
  • Diana -> test timing sw with real hardware

Cleaning up loose ends from first transition:

  • Artur -> operational monitor of processor tasks
  • Eric -> continue working on intergration tests
  • Better integration with drunc
  • John, Giovanna -> introduce an appropriate DUNEDAQ_DB_PATH variable

Transition of other DAQ modules to OKS (compatibly with high priority work for operations consolidation):

  • Diana -> hsilibs
  • Roland -> wibmod
  • Marco -> daphnemodules, ctbmodules
  • Ron -> sspmodules
  • Giovanna to discuss with Wes about crtmodules

Longer term developments:

  • Alessandro/Gordon -> OKS configuration internals
  • John -> session-segments-applications-modules and their connections viewer (using generate_modules), the option of viewing the full tree or starting from a branch should be considered for scalability
  • Discussion on strategy for schema/data editors to be had within the CCM team
  • Integration of features resulting from the appfwk workshop (e.g. action plans for distribution of commands within one application)
There are minutes attached to this event. Show them.
    • 08:00 08:20
      Status of release candidate testing & plans for release 20m
      Speakers: Artur Sztuc (University College London), Diana Antic (University of Bristol), Eric Flumerfelt (Fermilab), Giovanna Lehmann (CERN), Gordon Crone (University College London), Pierre Lasorak (Imperial College London)
    • 08:20 08:55
      Outstanding issues and near term work planning 35m
      • things that we know are not working fully
      • make list of near term developments we plan to tackle (with assigned resources)