Timing System Meeting

Europe/London
Description

Timing Week Ahead

Zoom: https://cern.zoom.us/j/65611907988?pwd=ak9jK04xdFY0OThzN3RRbEdVZkhNZz09

 

David Cussans is inviting you to a scheduled Zoom meeting.

Topic: DUNE Timing System Week Ahead
Time: Jan 17, 2022 11:00 AM London
        Every week on Mon, 20 occurrence(s)
        Jan 17, 2022 11:00 AM
        Jan 24, 2022 11:00 AM
        Jan 31, 2022 11:00 AM
        Feb 7, 2022 11:00 AM
        Feb 14, 2022 11:00 AM
        Feb 21, 2022 11:00 AM
        Feb 28, 2022 11:00 AM
        Mar 7, 2022 11:00 AM
        Mar 14, 2022 11:00 AM
        Mar 21, 2022 11:00 AM
        Mar 28, 2022 11:00 AM
        Apr 4, 2022 11:00 AM
        Apr 11, 2022 11:00 AM
        Apr 18, 2022 11:00 AM
        Apr 25, 2022 11:00 AM
        May 2, 2022 11:00 AM
        May 9, 2022 11:00 AM
        May 16, 2022 11:00 AM
        May 23, 2022 11:00 AM
        May 30, 2022 11:00 AM
Please download and import the following iCalendar (.ics) files to your calendar system.
Weekly: https://cern.zoom.us/meeting/u5ErduihrjwjEty6rVlnv8tn7IyhqaavFeey/ics?icsToken=98tyKu-tqDorE9SSuRGPR_MMBIj4d_PziGZEj7dEyg3TDy5FOhf4YctbOqN-Ec72

Join Zoom Meeting
https://cern.zoom.us/j/65611907988?pwd=ak9jK04xdFY0OThzN3RRbEdVZkhNZz09

Meeting ID: 656 1190 7988
Passcode: 959532
One tap mobile
+33170372246,,65611907988# France
+33170379729,,65611907988# France

Dial by your location
        +33 1 7037 2246 France
        +33 1 7037 9729 France
        +33 1 8699 5831 France
        +41 31 528 09 88 Switzerland
        +41 43 210 70 42 Switzerland
        +41 43 210 71 08 Switzerland
        +44 131 460 1196 United Kingdom
        +44 203 481 5237 United Kingdom
        +44 203 481 5240 United Kingdom
Meeting ID: 656 1190 7988
Find your local number: https://cern.zoom.us/u/cUwyxIgTf

Join by SIP
[email protected]
[email protected]

Join by H.323
188.184.89.188
188.185.118.153
Meeting ID: 656 1190 7988
Passcode: 959532

in attendace: DC, JM, AB, DL, DA, JPM, JTV, ST

There are minutes attached to this event. Show them.
    • 15:00 15:10
      Timestamp initialisation 10m
      Speakers: David Cussans (University of Bristol), Jonathon Sensenig (University of Pennsylvania), Jonathon Sensenig

      no update

    • 15:10 15:20
      Phase measurement functionality 10m
      Speakers: Jean-Pierre Martin (Universite de Montreal (CA)), Jean-Pierre Martin (Universite de Montreal (CA))

      ST tested in Bristol with loopback fibre, saw expected behaviour; testing with endpoint

    • 15:20 15:30
      Pre-production hardware/PRR preparation 10m
      Speakers: David Cussans (University of Bristol), Stoyan Trilov

      Pre-production hardware

      Design changes made to add debug points for checking clock/data phase; FIB due to be submitted for manufacture next week

      Work to be followed by MIB design changes; focus effort on MIB debugging

      DC prepared AFC quote draft, sent to Creotech for review

       

      PRR prep

      PRR date end of Feb '25; probably required approval from DAQ management - to be followed up

    • 15:30 15:40
      OKS transition/legacy software 10m
      Speakers: Diana Antic (University of Bristol), Stoyan Trilov

      OKS:

      schema refinement on-going; ST and DA iterating; two PRs pending for HSI and timinglibs

      once finished, work on GIB, MIB, FIB support

      action:

      ST to provide C++ feedback

      DA to continue working on schema refinement

       

      v4.4.x

      extra timing RC commands will be included in v.4.4.2 (due next week)

      action:

      DA to prepare PR

       

      no update on docker testing on-going; original finish date mid-June, it will likely slip

    • 15:40 15:45
      DTS service software 5m
      Speaker: Stoyan Trilov

      no feedback received yet

      action:

      ST to chase core DAQ sw, CCM for feedback

    • 15:45 15:55
      Operations support 10m
      Speakers: David Cussans (University of Bristol), Dennis Lindebaum (University of Bristol), Diana Antic (University of Bristol), Stoyan Trilov

      RTT measured and endpoint register access checked for CIB

      DL working on adding CRT timing unit to endpoint list

      AB will work on setting up an FMC as HSI on 31/05/24; ST will support putting config together

      DL will measure RTT on SSP on 31/05/24

       

      actions from previous meeting (ST, DL):

      shifter/expert instructions

      check dashboards

    • 15:55 16:00
      Round table 5m

      DC: AFC quote prep (see PPR/pre-production hardware item)

      JM, AB, DL, DA: no update

      JPM: free for DUNE in ~1 month, plan work offline

      JTV: working on porting ND config to OKS

      ST: away 05/06-14/06