Timing System Meeting

Europe/London
Description

Timing Week Ahead

Zoom: https://cern.zoom.us/j/65611907988?pwd=ak9jK04xdFY0OThzN3RRbEdVZkhNZz09

 

David Cussans is inviting you to a scheduled Zoom meeting.

Topic: DUNE Timing System Week Ahead
Time: Jan 17, 2022 11:00 AM London
        Every week on Mon, 20 occurrence(s)
        Jan 17, 2022 11:00 AM
        Jan 24, 2022 11:00 AM
        Jan 31, 2022 11:00 AM
        Feb 7, 2022 11:00 AM
        Feb 14, 2022 11:00 AM
        Feb 21, 2022 11:00 AM
        Feb 28, 2022 11:00 AM
        Mar 7, 2022 11:00 AM
        Mar 14, 2022 11:00 AM
        Mar 21, 2022 11:00 AM
        Mar 28, 2022 11:00 AM
        Apr 4, 2022 11:00 AM
        Apr 11, 2022 11:00 AM
        Apr 18, 2022 11:00 AM
        Apr 25, 2022 11:00 AM
        May 2, 2022 11:00 AM
        May 9, 2022 11:00 AM
        May 16, 2022 11:00 AM
        May 23, 2022 11:00 AM
        May 30, 2022 11:00 AM
Please download and import the following iCalendar (.ics) files to your calendar system.
Weekly: https://cern.zoom.us/meeting/u5ErduihrjwjEty6rVlnv8tn7IyhqaavFeey/ics?icsToken=98tyKu-tqDorE9SSuRGPR_MMBIj4d_PziGZEj7dEyg3TDy5FOhf4YctbOqN-Ec72

Join Zoom Meeting
https://cern.zoom.us/j/65611907988?pwd=ak9jK04xdFY0OThzN3RRbEdVZkhNZz09

Meeting ID: 656 1190 7988
Passcode: 959532
One tap mobile
+33170372246,,65611907988# France
+33170379729,,65611907988# France

Dial by your location
        +33 1 7037 2246 France
        +33 1 7037 9729 France
        +33 1 8699 5831 France
        +41 31 528 09 88 Switzerland
        +41 43 210 70 42 Switzerland
        +41 43 210 71 08 Switzerland
        +44 131 460 1196 United Kingdom
        +44 203 481 5237 United Kingdom
        +44 203 481 5240 United Kingdom
Meeting ID: 656 1190 7988
Find your local number: https://cern.zoom.us/u/cUwyxIgTf

Join by SIP
[email protected]
[email protected]

Join by H.323
188.184.89.188
188.185.118.153
Meeting ID: 656 1190 7988
Passcode: 959532

in attendance: JPM, ST, AB, Jim M., DC, DL

There are minutes attached to this event. Show them.
    • 15:00 15:20
      Operations support for PD2 20m
      Speakers: David Cussans (University of Bristol), Dennis Lindebaum (University of Bristol), Diana Antic (University of Bristol), Stoyan Trilov

      DL: power cut yesterday morning, timing system(s) restarted, np04-srv-023 delayed in coming back, some manual set-up; DAPHNE being monitored NP04

      AB: will confirm time at CERN, ST, DA,DC will provide cover

      ST: WIB firmware version being debugged, sfp tx disable now being monitored, can see flag toggling

       

      DL: dosimeter required for EHN1 access

       

      Action DC, ST: set up timing phone

    • 15:20 15:30
      Timestamp initialisation 10m
      Speakers: David Cussans (University of Bristol), Jonathon Sensenig, Jonathon Sensenig (University of Pennsylvania), Stoyan Trilov

      no update, new end date 01/09

      DC: work should be able restart next week

    • 15:30 15:40
      Pre-production hardware/PRR preparation 10m
      Speakers: David Cussans (University of Bristol), Stoyan Trilov

      ST on behalf DC: Creotech will be able to quote, one manufacturer confirmed that they are not able to quote

      ST on behalf DC: PH completed known MIB design changes. MMC testing in progress (see below). In meantime, PH will start GIB work.

      ST: MIB MMC work in progress. May need to switch MMC software frameworks if CERN MMC is no longer supported. One candidate is openMMC (used in AFC) does not support atmega128 uC out of box. Either add support for atmega128 uC to openMMC, or swap uC on MIB. Decision to be made in the next couple of weeks, and submit MIB for manufacture. Schedule has MIB submission end of July

    • 15:40 15:50
      OKS transition/legacy software 10m
      Speakers: Diana Antic (University of Bristol), Stoyan Trilov

      ST and DA iterating on schema and code changes, nearly complete. ST now testing. Will be included v5.1 release, code complete end of next week.

      ST on behalf DA: DA working on charon firmware design ID

       

       

       

       

       

       

       

    • 15:50 15:55
      DTS service software 5m
      Speaker: Stoyan Trilov

      ST will work on improving req. document, work on interfaces can happen over summer

    • 15:55 16:00
      Round table 5m

      DC: Thanks to DL for support last week

      DL: tidied up DAQ barrack, moved BNC cables, equipment to DAQ office, moved nexys board to AT''s office. Would be nice to find shelf for FMCs. Update expert guide to include instructions on how to program.

      Jim M.: No update

      JPM: ZC10U IPBus example, built using vivado 2022.2. ST provided endpoint example payload; https://gitlab.cern.ch/dune-daq/timing/dune-timing-firmware/-/blob/develop/projects/endpoint/firmware/hdl/payload.vhd?ref_type=heads

      ST: no update