DUNE PRR: FD-VD TDE MCH/Timing

Europe/Rome
zoom

zoom

Dario Autiero (IPNL), Takuya Hasegawa (KEK)
Description

Production Readiness Review  (Stage-1 and Stage-2) of the DUNE Vertical Drift Far Detector Top Drift Electronic (TDE) MicroTCA Carrier Hub and timing end nodes.

Review Home

Charge Letter

Zoom information for the public session (starting at 8:15 AM CST, 15:15 CET)

Review Documentation (Documentation Guide and main supporting documents for Procurement/Production)

Final Committee Report

 

Support
    • 15:00 15:15
      Executive session (Reviewers only) 15m
    • 15:15 15:30
      Introduction 15m
      Speaker: Dario Autiero (IPNL)
    • 15:30 15:45
      Value engineering change, MCH 25Gbit/s uplink and tests 15m
      Speaker: Vyacheslav Galymov
    • 15:45 16:00
      Value engineering change, replacement WR end-node 15m
      Speaker: Dario Autiero (IPNL)
    • 16:00 16:30
      Procurement/production documents (MCH, WR-end nodes, tongue PCBs) 30m
      Speaker: Dario Autiero (IPNL)
    • 16:30 16:40
      QC aspects 10m
      Speaker: Vyacheslav Galymov
    • 16:40 17:20
      Executive session 40m
      Speaker: Philippe Farthouat (CERN)