Please read these instructions before posting any event on Fermilab Indico

The FERMI(FNAL) network authorization method will be removed on Tuesday, Feb 4th at 5PM CST. See news for more details.

Timing System Meeting

Europe/London
Description

Topic: Timing System Meeting
Time: Sep 26, 2024 03:00 PM London

Join Zoom Meeting
https://cern.zoom.us/j/65611907988?pwd=ak9jK04xdFY0OThzN3RRbEdVZkhNZz09

Meeting ID: 656 1190 7988
Passcode: 959532
One tap mobile
+33170372246,,65611907988# France
+33170379729,,65611907988# France

Dial by your location
        +33 1 7037 2246 France
        +33 1 7037 9729 France
        +33 1 8699 5831 France
        +41 31 528 09 88 Switzerland
        +41 43 210 70 42 Switzerland
        +41 43 210 71 08 Switzerland
        +44 131 460 1196 United Kingdom
        +44 203 481 5237 United Kingdom
        +44 203 481 5240 United Kingdom
Meeting ID: 656 1190 7988
Find your local number: https://cern.zoom.us/u/cUwyxIgTf

Join by SIP
65611907988@188.184.89.188
65611907988@188.185.118.153

Join by H.323
188.184.89.188
188.185.118.153
Meeting ID: 656 1190 7988
Passcode: 959532

    • 15:00 15:15
      Pre-production hardware/PRR preparation 15m

      DUNE AFC v4 status

      MIB v3 status

      FIB v2 status

      GIB v2 status

      Documentation status

      Speakers: David Cussans (University of Bristol), Stoyan Trilov, Sudarshan Paramesvaran

      AFC status:

      Pre-production boards delayed, discussions on-going regarding production boards 

      MIB v3 status:

      DGC will chase manufacturer by phone

      FIB v2 status:

      DA to test FIBs once DTS HSI op-mon work complete

      GIB v2 status:

      GIB to be shipped 17/01

      MIB tongue2 v2

      DGC will contact PH again

      Documentation

      proposed document list and assigned authors:

      • Electrical review followed by Electrical safety doc : DGC
      • Design files : DGC
      • QA/QC plans : SP
      • Installation : to be removed, if current charge is accepted
      • Production/procurement doc : DGC
      • Intro and test doc : SP/DA to organise meeting to discuss this
    • 15:15 15:25
      Timestamp initialisation 10m
      Speakers: David Cussans (University of Bristol), Stoyan Trilov

      Change this to TAI IRIG point

    • 15:25 15:35
      DUNE DAQ v5.2.0 10m

      DTS HSI in v5.x.x
      - OKS
      - Op mon

      timing-drunc integration
      - custom FSM
      - timing commands with arguments

      Gaia high level support

      Speakers: Diana Antic (University of Bristol), Stoyan Trilov

      DA in final stages of testing DTS HSI op-mon, due to finish 24/01

    • 15:35 15:40
      DTS service software 5m
      Speaker: Stoyan Trilov

      no update - ST to resume working on capturing requirements

    • 15:40 15:50
      Phase measurement functionality / Endpoint on Ultrascale+ fabric 10m
      Speakers: Jean-Pierre Martin (Universite de Montreal (CA)), Jean-Pierre Martin (Universite de Montreal (CA)), Stoyan Trilov

      Nexys being shipped to JPM, ZCU102 being purchased locally

    • 15:50 15:55
      Operations support 5m

      NP04

      NP02

      ICEBERG

      Shipping Timing Unit to CRP factories

      Speakers: David Cussans (University of Bristol), Dennis Lindebaum (University of Bristol), Diana Antic (University of Bristol), Stoyan Trilov

      NP04: 

      DA and DL configured fanout-0, DA configure timing hardware on next power cut

      NP02:

      integration with TDE outstanding, planning to be done

      DGC supporting CRT integration (both Bern and Grenoble)

      ICEBERG:

      Future of ICEBERG is uncertain

    • 15:55 16:00
      Round table 5m