Please read these instructions before posting any event on Fermilab Indico

Indico will be unavailable on Monday Feb 17th from 4:30-5PM CST due to server maintenance.

Timing System Meeting

Europe/London
Description

Topic: Timing System Meeting
Time: Sep 26, 2024 03:00 PM London

Join Zoom Meeting
https://cern.zoom.us/j/65611907988?pwd=ak9jK04xdFY0OThzN3RRbEdVZkhNZz09

Meeting ID: 656 1190 7988
Passcode: 959532
One tap mobile
+33170372246,,65611907988# France
+33170379729,,65611907988# France

Dial by your location
        +33 1 7037 2246 France
        +33 1 7037 9729 France
        +33 1 8699 5831 France
        +41 31 528 09 88 Switzerland
        +41 43 210 70 42 Switzerland
        +41 43 210 71 08 Switzerland
        +44 131 460 1196 United Kingdom
        +44 203 481 5237 United Kingdom
        +44 203 481 5240 United Kingdom
Meeting ID: 656 1190 7988
Find your local number: https://cern.zoom.us/u/cUwyxIgTf

Join by SIP
65611907988@188.184.89.188
65611907988@188.185.118.153

Join by H.323
188.184.89.188
188.185.118.153
Meeting ID: 656 1190 7988
Passcode: 959532

    • 1
      Pre-production hardware/PRR preparation

      DUNE AFC v4 status

      MIB v3 status

      FIB v2 status

      GIB v2 status

      Documentation status

      Speakers: David Cussans (University of Bristol), Stoyan Trilov, Sudarshan Paramesvaran

      AFC status:

      Pre-production boards delayed, discussions on-going regarding production boards 

      MIB v3 status:

      DGC will chase manufacturer by phone

      FIB v2 status:

      DA to test FIBs once DTS HSI op-mon work complete

      GIB v2 status:

      GIB to be shipped 17/01

      MIB tongue2 v2

      DGC will contact PH again

      Documentation

      proposed document list and assigned authors:

      • Electrical review followed by Electrical safety doc : DGC
      • Design files : DGC
      • QA/QC plans : SP
      • Installation : to be removed, if current charge is accepted
      • Production/procurement doc : DGC
      • Intro and test doc : SP/DA to organise meeting to discuss this
    • 2
      Timestamp initialisation
      Speakers: David Cussans (University of Bristol), Stoyan Trilov

      Change this to TAI IRIG point

    • 3
      DUNE DAQ v5.2.0

      DTS HSI in v5.x.x
      - OKS
      - Op mon

      timing-drunc integration
      - custom FSM
      - timing commands with arguments

      Gaia high level support

      Speakers: Diana Antic (University of Bristol), Stoyan Trilov

      DA in final stages of testing DTS HSI op-mon, due to finish 24/01

    • 4
      DTS service software
      Speaker: Stoyan Trilov

      no update - ST to resume working on capturing requirements

    • 5
      Phase measurement functionality / Endpoint on Ultrascale+ fabric
      Speakers: Jean-Pierre Martin (Universite de Montreal (CA)), Jean-Pierre Martin (Universite de Montreal (CA)), Stoyan Trilov

      Nexys being shipped to JPM, ZCU102 being purchased locally

    • 6
      Operations support

      NP04

      NP02

      ICEBERG

      Shipping Timing Unit to CRP factories

      Speakers: David Cussans (University of Bristol), Dennis Lindebaum (University of Bristol), Diana Antic (University of Bristol), Stoyan Trilov

      NP04: 

      DA and DL configured fanout-0, DA configure timing hardware on next power cut

      NP02:

      integration with TDE outstanding, planning to be done

      DGC supporting CRT integration (both Bern and Grenoble)

      ICEBERG:

      Future of ICEBERG is uncertain

    • 7
      Round table