This review is targeted at a preliminary analysis of the vacuum system issues associated with the MICE RF Module (RFM) as we prepare to complete the RFM design.

Please NOTE: the review will formally begin at 10:30 AM on Tuesday (9:30 session is a MAP+LBNL management meeting)
Actuator drawings (zip)
Construction status
Review Charge
  • Tuesday, 27 January
    • 09:30 10:30
      Pre-Review: LBNL Progress Report 1h
    • 10:30 11:30
      Executive Session 1h
      Slides
    • 11:30 13:00
      Lunch 1h 30m
    • 13:00 13:30
      MICE RF System Introduction 30m
      Speaker: Dr Derun Li (LBNL)
      Slides
    • 13:30 13:45
      Single Cavity Test System Vacuum System in MTA 15m
      Speaker: Alex Chen (Fermilab)
    • 13:45 14:05
      Conceptual Design of the MICE RF Module (RFM) Vacuum System 20m
      Speaker: Mr Andrew Lambert (Lawrence Berkeley National Laboratory)
      Slides
    • 14:05 14:25
      MICE RF Coupler Design Modifications 20m
      Speaker: Mr Andrew Lambert (Lawrence Berkeley National Laboratory)
      Slides
    • 14:25 14:55
      Vacuum System Calculations for the RFM 30m
      Speaker: Steve Marks (LBNL)
      Vacuum Analysis Document
    • 14:55 15:15
      RFM Plan and Schedule 20m
      Speaker: Dr Soren Prestemon (Lawrence Berkeley National Laboratory)
      Slides
    • 15:15 15:30
      Coffee Break 15m
    • 15:30 17:00
      Executive Session 1h 30m
      Committee questions delivered at conclusion
    • 18:00 20:00
      Dinner 2h
  • Wednesday, 28 January
    • 09:00 09:45
      Answers to Committee Questions 45m
      Actuator Functionality Test Results
    • 09:45 10:15
      Executive Session 30m
    • 10:15 10:30
      Coffee Break 15m
    • 10:30 11:00
      Closeout 30m
    • 11:00 11:30
      MAP Mgmt/LBNL Mgmt Discussion 30m