9 AM Meeting (03 Jul 2017)
==================
Linac
==================
-
Running well.
-
Would still take oportunisitc time to look into KRF6.
-
Studies request: Beam Energy/Linac Phase, 8 hours
==================
Booster
==================
-
Down BRF4
-
Returned for Laser notcher off.
-
Laser Notcher is being looked at now.
-
Studies Requests:
-
Beam profile monitor 2 hours: not today
-
GMPS 4 hours: Possibly after the Laser Notcher work is complete.
-
Don't suspect it will be 4 hours.
==================
Booster Neutrino
==================
Running well
==================
BNB Experiments
==================
Running well
==================
Main Injector & Recycler
==================
-
Recycler Damper amp has been problematic over the weekend. Looking at it today.
-
Looking into MIRF3 SSD 50V PS control trips
-
Studies requests:
-
Approved as schedule allows
-
RR injection loss vs. turns.
-
MI8 auto-tune. Mostly parasitic with occasional interupptions to beam.
-
$E3 end of cycle instability. Parasitic.
-
RR growth rate. Parasitic, uses $E0 events.
-
Waiting
-
RR injection loss vs. turns.
-
MI PS study (need more details)
-
MI short ramp. Parasitic.
==================
NuMI
==================
-
Looking into evaporator fan alarms
-
MI62 LCW leak rate has increased
-
Horn currnet scans completed.
==================
NuMI Experiments
==================
Running well
==================
Muon Rings
==================
-
Abort Septa confirmed bad, will replace during shutdown
-
M5 studies all weekend
-
AP0 air monitor was replaced Saturday.
-
Studies requests:
-
M1 loss studies, with 2.5 Mhz RF (preferred) and 53 Mhz. Both approved
-
8 GeV studies. Also approved with coordination with experiment
==================
Muon Experiments
==================
Taking data
==================
SY120
==================
-
F:MC2H failed over the weekend. Tuned around. Being looked at today.
-
Checked pin hole collimator readbacks
==================
SY120 Experiments
==================
Taking data
==================
ES&H
==================
N/A
==================
EE Support
==================
Nothing to report
==================
Mechanical
==================
Nothing to report
==================
Fluids
==================
-
Added water to LRF4 & 5.
-
Investigating MI62 leak rate increase
-
MI Colum 1 is dying.
==================
RF
==================
-
Investigatin MIRF3 solid state dr.
-
Looking into RR 2.5 Mhz for Muon
==================
MTA
==================
-
Dry engine replacement underway. Estimate recovery late tonight.
==================
Controls
==================
Nothing to report
==================
Instrumentation
==================
Nothing to report
==================
FESS
==================
N/A