31 July 2017 to 4 August 2017
Fermi National Accelerator Laboratory
US/Central timezone

CEPC R&D and key technologies

3 Aug 2017, 13:55
25m
West Wing (Fermi National Accelerator Laboratory)

West Wing

Fermi National Accelerator Laboratory

Presentation Accelerators Accelerators

Speaker

Mr YUNLONG CHI (Institute of High Energy Physics, Chinese Academy of Sciences)

Description

CEPC is a 100 km circular electron-positron collider operating at 90-240 GeV center-of-mass energy of Z-pole, WW pair production threshold, and Higgs resonance. CEPC and its successor SPPC, a 100 TeV center-of-mass super proton-proton collider, will ensure the elementary particle physics a vibrant field for decades to come. To reduce the overall cost, partial double ring scheme was proposed as the alternative, which has a significant impact on the cavity operation and beam dynamics. The conceptual design report (CDR) of CEPC will be completed by the end of 2017 as an important step to move the project forward. In this presentation, the progress of CEPC accelerator key technology R&D status will be shown, including SRF system, High efficiency klystron etc.

Primary author

Mr YUNLONG CHI (Institute of High Energy Physics, Chinese Academy of Sciences)

Presentation materials