Please read these instructions before posting any event on Fermilab Indico

Indico will be unavailable on Wed., Dec 18th from 7 - 7:30am due to server maintenance.

G-2 inflector review

US/Central
TD/IB3A conf. room (Fermilab TD/IB3A)

TD/IB3A conf. room

Fermilab TD/IB3A

Description
This is a review of the engineering design of the g-2 inflector magnet. The purpose of this review is to evaluate the status of the prototype design and manufacturing plans for the magnet, including cost and schedule.
agenda
document
Slides
Participants
  • Vladimir Kashikhin
    • 8:30 AM 8:50 AM
      Committee Executive Session
    • 8:50 AM 9:30 AM
      Overview of magnet parameters and new design
      Convener: Vladimir Kashikhin (Fermilab/TD/MSD)
      slides
    • 9:30 AM 10:20 AM
      Mechanical design, magnet fabrication and tooling
      Convener: Steve Krave (Fermilab)
      document
      slides
    • 10:20 AM 10:35 AM
      Coffee Break 15m
    • 10:35 AM 10:55 AM
      Short model test and room temperature magnetic measurements
      Convener: Thomas Strauss (FNAL)
      slides
    • 10:55 AM 11:15 AM
      Preliminary proposal for cold test
      Convener: Thomas Strauss (FNAL)
      slides
    • 11:15 AM 11:30 AM
      Installation of New Inflector Cold Mass: The Concept
      slides
    • 11:30 AM 12:00 PM
      Cost and Schedule
      document
      slides
    • 12:00 PM 1:00 PM
      Lunch 1h
    • 1:00 PM 2:00 PM
      Committee Executive Session
    • 2:00 PM 2:15 PM
      Questions from the Committee
    • 2:15 PM 3:15 PM
      Coffee Break 1h

      Preparing Answers

    • 3:15 PM 4:00 PM
      Answers to Committee Questions
    • 4:00 PM 5:10 PM
      Committee Executive Session / Preliminary Report Writing
    • 5:10 PM 5:30 PM
      Closeout