9 AM Meeting

US/Central
Huddle

Huddle

Description
Mon-Thurs Accelerator Scheduling Meeting
9 AM Meeting (08 May 2017)

Crew Chief Operations Summary

  • Good weekend. Some Booster RF issues. See slide.
Linac
  • Quiet weekend.
Booster
  • Running well except RF sparking. Need to change out board on LLRF. 15-20 minutes est. $17 and one-shot studies.
Booster Neutrino
  • Running well.
BNB Experiments
  • Running well.
Main Injector & Recycler
  • Quiet weekend. P1 line vacuum burst. Recycler LAM52 overtemp. Studies later this month/week
  • Cycle time to 1.2 seconds and moving infection time.
NuMI
  • Running well.
NuMI Experiments
  • Running well.
Muon Rings
  • Took orbit data over the weekend. Now working on shunts. Trying to get circulating beam. Access for instrumentation work. Beam later today.
SY120
  • Good weekend. M03 experiment uninstall either today or tomorrow. (Would prefer controlled access for uninstall)
SY120 Experiments
  • Running smoothly. Small installation on Wednesday in Mtest.
ES&H
  • Nothing to report.
EE Support
  • Nothing to report.
Mechanical
  • I:IP521 faulted. MP7 chiller online. Replaced ArCO2 bottle @ Muon Campus.
Fluids
  • Nothing to report.
RF
  • Will work with Booster to understand RF sparking issues. Incidental MIRF & RRRF trips.
MTA
  • Running well. Will pull cavity for work, then re-install.
Controls
  • Nothing to report.
Instrumentation
  • Nothing to report.
FESS
  • Nothing to report.
Miscellaneous
  • Monday downday for Comm Ed power & other accelerator work.
There are minutes attached to this event. Show them.
    • 1
      Crew Chief Operations Summary
      Slides
      Good weekend.  Some Booster RF issues.  See slide.
    • 2
      Linac
      Quiet weekend.
    • 3
      Booster
      Running well except RF sparking.  Need to change out board on LLRF. 15-20 minutes est. $17 and one-shot studies.
    • 4
      Booster Neutrino
      Running well.
    • 5
      BNB Experiments
      Running well.
    • 6
      Main Injector & Recycler
      Quiet weekend.  P1 line vacuum burst.  Recycler LAM52 overtemp.   Studies later this month/week
      Cycle time to 1.2 seconds and moving infection time.
    • 7
      NuMI
      Running well.
    • 8
      NuMI Experiments
      Running well.
    • 9
      Muon Rings
      Took orbit data over the weekend.  Now working on shunts.  Trying to get circulating beam.  Access for instrumentation work.  Beam later today.
    • 10
      SY120
      Good weekend.  M03 experiment uninstall either today or tomorrow.  (Would prefer controlled access for uninstall)
    • 11
      SY120 Experiments
      Running smoothly.  Small installation on Wednesday in Mtest.
    • 12
      ES&H
      Nothing to report.
    • 13
      EE Support
      Nothing to report.
    • 14
      Mechanical
      I:IP521 faulted.  MP7 chiller online.  Replaced ArCO2 bottle @ Muon Campus.
    • 15
      Fluids
      Nothing to report.
    • 16
      RF
      Will work with Booster to understand RF sparking issues.   Incidental MIRF & RRRF trips.
    • 17
      MTA
      Running well.   Will pull cavity for work, then re-install.
    • 18
      Controls
      Nothing to report.
    • 19
      Instrumentation
      Nothing to report.
    • 20
      FESS
      Nothing to report.
    • 21
      Miscellaneous
      Monday downday for Comm Ed power & other accelerator work.