9 AM Meeting

US/Central
Huddle

Huddle

Description
Mon-Thurs Accelerator Scheduling Meeting
9 AM Meeting (12 Jun 2017)

Linac

  • Running well with few problems.
Booster
  • Good weekend.
  • Will continue Laser Notcher commissioning and Chandra will be doing some parasitic studies.
Booster Neutrino
  • Running well.
  • Tom Kobilarcek is BNB coordinator this week.
BNB Experiments
  • Running well.
  • Cindy Joe is Microboone coordinator this week.
Main Injector & Recycler
  • Ran well.
  • Request RR TBT study on $E0 cycles.
NuMI
  • LCW loss rate is a little higher than before, so if time is available they would like to search for a leak.
NuMI Experiments
  • Running well.
Muon Rings
  • Running well with a few issues already mentioned in CC report.
  • Preparing for a chipmunk TLM study on Wednesday.
Muon Experiments
  • Exciting weekend.
  • Saw real experimental data with 10K events in the calorimeter.
  • Having some problems with ring quads that required going open access this weekend and today.
SY120
  • Meson LCW issues required bringing another tower online.
  • It may be possible to reduce heat load by running in different modes if need be.
SY120 Experiments
  • LAriat is closed up and taking liquid argon today.
  • SeaQuest is taking data.
  • MTEST will be installing a new experiment on Wednesday.
Mechanical
  • F4 heat exchanger test cleaning is in progress.
Fluids
  • Running well.
  • Made up water at MI65.
RF
  • Running well.
Controls
  • MI60S #3 VME crate supply was replaced.
  • Meson crates 14 and 18 power supplies were replaced this morning.
  • Working with MI group to get the new G-2 timing to operate correctly with other machine cycles.
FESS
  • Dealing with high water temps.
  • Meson cryo strainer work is complete.
  • Had some issues at CUB, probably due to more of the "Minos muck" getting into the system.
  • Replaced some breakers for the industrial buildings.
  • Minos sumps are now all pumping close to design capacity, so it appears that the chlorination is having a positive effect on the muck problem.
There are minutes attached to this event. Show them.
    • 09:00 09:01
      Crew Chief Operations Summary 1m
      Slides
    • 09:01 09:02
      Linac 1m
      Running well  with few problems.
    • 09:02 09:03
      Booster 1m
      Good weekend.
      Will continue Laser Notcher commissioning and Chandra will be doing some parasitic studies.
    • 09:03 09:04
      Booster Neutrino 1m
      Running well. 
      Tom Kobilarcek is BNB coordinator this week.
    • 09:04 09:13
      BNB Experiments 9m
      Running well.
      Cindy Joe is Microboone coordinator this week.
    • 09:13 09:18
      Main Injector & Recycler 5m
      Ran well.
      Request RR TBT study on $E0 cycles.
    • 09:18 09:19
      NuMI 1m
      LCW loss rate is a little higher than before, so if time is available they would like to search for a leak.
    • 09:19 09:20
      NuMI Experiments 1m
      Running well.
    • 09:20 09:21
      Muon Rings 1m
      Running well with a few issues already mentioned in CC report.
      Preparing for a chipmunk TLM study on Wednesday.
    • 09:21 09:22
      Muon Experiments 1m
      Exciting weekend.
      Saw real experimental data with 10K events in the calorimeter.
      Having some problems with ring quads that required going open access this weekend and today.
    • 09:22 09:23
      SY120 1m
      Meson LCW issues required bringing another tower online.
      It may be possible to reduce heat load by running in different modes if need be.
    • 09:23 09:24
      SY120 Experiments 1m
      LAriat is closed up and taking liquid argon today.
      SeaQuest is taking data.
      MTEST will be installing a new experiment on Wednesday.
    • 09:25 09:26
      ES&H 1m
    • 09:26 09:27
      EE Support 1m
    • 09:27 09:28
      Mechanical 1m
      F4 heat exchanger test cleaning is in progress.
    • 09:28 09:29
      Fluids 1m
      Running well.
      Made up water at MI65.
    • 09:29 09:30
      RF 1m
      Running well.
    • 09:30 09:31
      MTA 1m
    • 09:31 09:32
      Controls 1m
      MI60S #3 VME crate supply was replaced.
      Meson crates 14 and 18 power supplies were replaced this morning.
      Working with MI group to get the new G-2 timing to operate correctly with other machine cycles.
    • 09:32 09:33
      Instrumentation 1m
    • 09:33 09:34
      FESS 1m
      Dealing with high water temps.
      Meson cryo strainer work is complete.
      Had some issues at CUB, probably due to more of the "Minos muck" getting into the system.
      Replaced some breakers for the industrial buildings.
      Minos sumps are now all pumping close to design capacity, so it appears that the chlorination is having a positive effect on the muck problem.
    • 09:35 09:36
      Miscellaneous 1m