Please read these instructions before posting any event on Fermilab Indico

The FERMI(FNAL) network authorization method will be removed on Tuesday, Feb 4th at 5PM CST. See news for more details.

11–14 May 2008
Hyatt Regency Chicago
US/Central timezone

Disaster Recovery on Steroids

14 May 2008, 11:00
40m
Columbus G (Hyatt Regency Chicago)

Columbus G

Hyatt Regency Chicago

151 East Wacker Drive, Chicago, Illinois, USA 60601

Speaker

Kent Linsenmann (Idaho National Laboratory)

Description

The Idaho National Laboratory (INL) has recently completed a multiyear Disaster Recovery (DR) project to ensure rapid recovery in the event of natural disasters, catastrophic hardware failures, or unforeseen events requiring near immediate resumption of service. The INL identified a DR location 50 miles from the Idaho Falls production data center which is located at the INL high mountain desert facility. The DR strategy includes real-time replication of 12 TB of production data, tape backups to DR location, shadow image instances, and application development environment

Primary author

Kent Linsenmann (Idaho National Laboratory)

Presentation materials