Accelerator Scheduling Meeting

9 AM Meeting (09 Apr 2018)


Linac
RFQ anode PS tripped Sunday evening, requiring replacement of a HV connector.
Running well otherwise.


Booster
Running well.


Booster Neutrino
Running well.


BNB Experiments
Running well.


Main Injector & Recycler
Running well.
Experts came in over the weekend to repair kickers in MI and RR.
Plan to continue doing 1.2 sec ramp studies.
Would like to do a Recycler dispersion measurement since Muon is off.


NuMI
Doing OK.


NuMI Experiments
Running well. Thanks for notification about the downtime so they could restart their run.


Muon Rings
Lithium lens failure occured on Friday. Water conductivity and pH are characteristic of a septum failure. Repair planning meeting is in progress and it is hoped that beam could be run as early as late Tuesday. Stay tuned for updates in the log.
Other issues include a PRAC problem with V003 but a fix has been implemented and will be tested.
May access delivery ring to appply vacseal to a small leak.
If there is a time with no beam going to MI, they would like to access Transport enclosure for at least an hour.


Muon Experiments
Used the downtime to do field measurements over the weekend.
Requesting a ~4 hour notice before beam returns to do a trolley run.


SY120
Running well.
CUB water consumption has increased to 1GPH. Monitoring the situation.
Experiments will be changing over on Wednesday.


SY120 Experiments
No report.


ES&H
Nothing to report.


EE Support
Nothing to report.


Mechanical
Made up water in Linac. Observed some level increasing w/o making up however, so will request time to bleed off the affected system.
MI20 LCW regulation issues were fixed by Controls on Friday and it is regulating well.
Muon IP003 appears to be leaking and will require access to address.
CUB column 3 will need to be regenerated this week.


RF
Running well!
The 3-way valves at MI60 and MI20 are regulating well now.


Controls
Nothing to add.


Instrumentation
Nothing to add.


FESS
SLI load xfer project is complete.
100HP backup pumps will be down.

There are minutes attached to this event. Show them.
    • 1
      Crew Chief Operations Summary
      Slides
    • 2
      Linac

      RFQ anode PS tripped Sunday evening, requiring replacement of a HV connector.

      Running well otherwise.

    • 3
      Booster

      Running well.

    • 4
      Booster Neutrino

      Running well.

    • 5
      BNB Experiments

      Running well.

    • 6
      Main Injector & Recycler

      Running well.

      Experts came in over the weekend to repair kickers in MI and RR.

      Plan to continue doing 1.2 sec ramp studies.

      Would like to do a Recycler dispersion measurement since Muon is off.

       

    • 7
      NuMI

      Doing OK.

    • 8
      NuMI Experiments

      Running well.  Thanks for notification about the downtime so they could restart their run.

       

    • 9
      Muon Rings

      Lithium lens failure occured on Friday.  Water conductivity and pH are characteristic of a septum failure. Repair planning meeting is in progress and it is hoped that beam could be run as early as late Tuesday.  Stay tuned for updates in the log.

        Other issues include a PRAC problem with V003 but a fix has been implemented and will be tested.

      May access delivery ring to appply vacseal to a small leak.

      If there is a time with no beam going to MI, they would like to access Transport enclosure for at least an hour.

    • 10
      Muon Experiments

      Used the downtime to do field measurements over the weekend.

      Requesting a ~4 hour notice before beam returns to do a trolley run.

       

    • 11
      SY120

      Running well.

      CUB water consumption has increased to 1GPH. Monitoring the situation.

      Experiments will be changing over on Wednesday.

    • 12
      SY120 Experiments

      No report.

    • 13
      ES&H

      Nothing to report.

    • 14
      EE Support

      Nothing to report.

    • 15
      Mechanical

      Made up water in Linac.  Observed some level increasing w/o making up however, so will request time to bleed off the affected system.

      MI20 LCW regulation issues were fixed by Controls on Friday and it is regulating well.

      Muon IP003 appears to be leaking and will require access to address.

      CUB column 3 will need to be regenerated this week.

       

    • 16
      Fluids
    • 17
      RF

      Running well!

      The 3-way valves at MI60 and MI20 are regulating well now.

       

    • 18
      Controls

      Nothing to add.

    • 19
      Instrumentation

      Nothing to add.

    • 20
      FESS

      SLI load xfer project is complete.