9 AM Meeting

US/Central
Huddle

Huddle

Description
Accelerator Scheduling Meeting
    • 1
      Crew Chief Operations Summary
      Slides
    • 2
      Linac

      Linac is running good.  The 400MeV LCW skid has a leak.  

    • 3
      Booster

      Currently running well.  Ran lots of beam over the weekend.  4.7e12ppp to NuMI, 4.4e12 ppp to Muon, and 4.1e12 ppp to BnB.

    • 4
      Booster Neutrino

      Running Well

    • 5
      BNB Experiments

      MicroBoone is running well.

    • 6
      Main Injector & Recycler

      Running well.  Same studies request as last Friday.  Still looking at the MI52 septa and vacuum.

    • 7
      NuMI

      Running well.  Suspect a helium leak on the target.

    • 8
      NuMI Experiments

      Running well

    • 9
      Muon Rings

      Good running over the weekend.  There were three nuisance trips on the dump water flow.  There are redundant sensors in the system and will maybe jumper this flow sensor.  During studies noticed 180Hz noise on I:HVF11.

    • 10
      Muon Experiments

      Mixed weekend.  Had around 36 hours of very good running.  There was a trolley run and after the run the magnet dumped on a cryo input.  After recovery had to do another trolley run.  Also have problems with one of the kickers.

    • 11
      SY120

      Running well

    • 12
      SY120 Experiments

      One group in Mtest finished over the weekend.  One remaining group right now.  Will request beam when needed.

    • 13
      ES&H

      There are chipmunk due for calibration.  These will need to be changed be for the end of the month.

    • 14
      EE Support

      Will look at noise on I:HVF11 when the supply is available.

    • 15
      Mechanical

      Have done a temporary patch on the 400MeV LCW skid to stop a leak. 

    • 16
      Fluids
    • 17
      RF

      All system look good.

    • 18
      Controls

      OPS replace a C190 card at AP50 that failed over the weekend.

    • 19
      Instrumentation

      Nothing

    • 20
      FESS

      Bring cooling and AC units on line for summer running.  Chiller 4 repairs are done and it should be available by the end of the week.  The annual valve exercising has started. 

    • 21
      Miscellaneous
    • 22
      MTA