Sites meeting
James Perry
Working on configuration to make it more configurable
Moving experiment-specific stuff to external packages
What about site-specific—there are changes in latest version that ought to help with them.
What we really need is QOS stuff
——
Checksum mismatches
Steve noticed 2 dual phase files which hadn’t shown as transfer to tape, these turn out
To be checksum mismatches we will have to resend.
—
Nersc running
Failure in the metadata extractor that looks like a timeout but might not be.
If the metadata extractor fails it doesn’t copy the file to the local NERSC
Could take out the part that does the declaration.
——
NP02 data at IN2P3—was run 1265 copied there? Yes but it appears it was not declared to SAM.
——
FTS3/Rucio at NERSC
Non-CMS FTS3 server at FNAL in progress but not likely to be ready soon. May be able
To use fts3.fnal.gov (CMS owned) for testing purposes. Needed to get the Nersc-generated
MC back to Fermilab.
—
Future meetings?
There is one on 16 dec 2019. There may be one on 23 dec 2019, will go with what Heidi announced. Will definitely not be one on 30 Dec. 2019;.