-
14:25
Status of the Vacuum Systems of the FAIR Accelerator Complex -
-
Andreas Kraemer
(GSI Helmholtzzentrum für Schwerionenforschung GmbH)
-
14:50
LCLS-II-HE cryomodule production at Fermilab
-
Tug Arkan
(Fermilab)
-
15:15
LCLS-II Particle Free Vacuum System: assembly and commissioning
-
Giulia Lanza
(SLAC National Accelerator Laboratory)
Robert Coy
(SLAC National Lab)
-
16:00
Operational Experience of a Cryomodule Test Stand for LCLS-II Cryomodules
-
Brian Hartsell
(Fermilab)
-
16:25
Low Particulates Vacuum Operation in SRF Cavity and String Assembly
-
Genfa Wu
(FNAL/TD)
-
16:50
the Protection of low particulate vacuum for SRF from catastrophe failure of neighboring UHV
-
Alex Zuxing Chen
(Fermilab)
-
17:15
Field installation of cryomodule vacuum systems at Fermilab
-
Curtis Baffes
(Fermilab)