Review Scope
Overview of the HB650 Transportation Plan
Overview of the HB650 Transportation Specification
Document management structure
Project Perspective: Risks and Mitigations
Discussion
a. Transportation System Overview
b. Mechanical Design of the Transport Frame
c. Expected Isolation System Performance
d. Transport Frame as Lifting Fixture
e. Interface Description including drawing/model review
a. Proto Frame Procurement
b. Dummy Load Procurement and Testing at FNAL
c. Dummy Load Shipment to STFC-UKRI/Validation Testing at STFC-UKRI
d. Local Road Testing at FNAL with Prototype HB650
e. Integrated Validation Transport to and from STFC-UKRI
f. Integrated QC and Safety Efforts
Brief summary of the HB650 transportation design calculations
Open discussion time if needed
Close out of the review including first impressions by the review committee.