Dear BARC/IJCLAB/FNAL colleagues,

You are invited to participate to the SSRs coordination meeting

When:

Thursady May 28th, 2019 at 7.30am Central Standard Time (CST)

Agenda:

- FNAL status/updates on cavities, tuners, couplers, solenoids and cryomodules (15 min)

- SSR2 cavity status/updates [Mattia/Donato]

- Update on SSR2 solenoid design [Cristian/Stoyan]

- Update on SSRs coupler design [Donato/Nikolay]

- BARC status/updates on SSRs activities [Srinivas et al.] (15 min)

- IJCLAB status/updates on SSRs activities [David et al.] (15min)

- Any other business [All participants] (15 min)

Join Teams Meeting, please see email for connection details.

 

- FNAL updates:

Donato: SSR1 pCM to be tested in about 2 weeks time

Donato: SSR2, PO for bare cavity to be issued in approx 1-2 weeks time, Nb procurement on track with Ningxia

Cristian: SSR2 solenoid FDR to be held in the second half of July, good progress with design and drawings at BARC

Srinivas/Vinay: question about cryomodule design for SSR2 when BARC can start designing their pCM, meeting with Lia may be needed.

Paolo: Summary presentation about processing plans for SSR2 cavities

BARC updates:

Vinay: still in lock-down, released some drawing for Nb-Ti welds but not much activity also at vendors due to COVID-19 lock-down.

Srinivas: processing plans, will probably follow FNAL plans, facilities for processing and testing of SSR2 not yet built at BARC, most likely cavities will be processed at RRCAT updated facility. Testing at RRCAT as well. BARC will then build their own facilities, but not necessarily in time for the R&D phase of SSR2 cavities, for production phase very likely.

BARC is requiring a dedicated meeting to discuss SSR1 cryomodule documentation and dates to start SSR2 cryomodule design.

ACTION ITEMS:

- FNAL to discuss internally about SSR2 cryomodule design at BARC: start date and documents necessary for the activity to start

There are minutes attached to this event. Show them.
    • 07:30 07:45
      - FNAL SSRs status/updates on cavities, tuners, couplers, solenoids and cryomodules 15m
      Monthly status and udates from FNAL
      Speakers: Cristian Boffo, Donato Passarelli (Fermilab), Mattia Parise (Fermilab), Paolo Berrutti (Fermilab), Stoyan Stoynev (FNAL)
    • 07:45 08:00
      - BARC status/updates on SSRs activities [Srinivas/Vinay/Rajesh/Mentes] 15m
      Monthly status and udates from BARC
      Speakers: Mentes Jose (BARC), Dr Rajesh Kumar (BARC), Dr Srinivas Krishnagopal (BARC), Mr Vinay Mishra (BARC)
    • 08:00 08:15
      - IJCLAB status/updates on SSR2 activities [David] 15m
      Monthly status and updates by IJCLAB
      Speaker: Dr david longuevergne (IPNO - CNRS)
    • 08:15 08:30
      - AOB [All] 15m