10–14 Sep 2012
Fermi National Accelerator Laboratory
US/Central timezone

Alignment Measurement Program Design of HITFiL

11 Sep 2012, 13:25
25m
1 West (Wilson Hall)

1 West

Wilson Hall

Paper Survey & Alignment of Beamline and Machine Components Survey & Alignment of Beamline and Machine Components

Speaker

Mr jiandong yuan (Institute of Modern Physics , Chinese Academy of Sciences)

Description

the biggest challenges in the design of measuring scheme of Heavy Ion Therapy Facility in Lanzhou is the vertical treatment segment of high-energy transport line which is out of sight and high precision requirements, by using the laser tracker, Portable three coordinate measuring machine and digital levels and so on, and data processing software: SpatialAnalyzer, this article completed the equipment installation project design, such as magnet, vacuum chamber, pipe, Beam diagnostic components, high frequency cavity and so on, the process including control nets transfer measurement, components fiducialization, pre alignment and installation on site. The author use SpatialAnalyzer to simulate the survey of control network and the installation of components, use the bundle adjustment of unified spatial metrology network (USMN), estimated error, and make it satisfy the requirement of accuracy.

Primary author

Mr jiandong yuan (Institute of Modern Physics , Chinese Academy of Sciences)

Co-author

guozhu cai (Institute of Modern Physics , Chinese Academy of Sciences)

Presentation materials

There are no materials yet.