Resources for Magnet Test and Installation at DAB

US/Central
    • 14:00 14:10
      Cost estimate for installation and commissioning of cryogenic system 10m
      Speaker: David Montanari (Fermilab)
    • 14:10 14:20
      Cost estimate for receiving magnet at DAB 10m
      Speaker: Claudio Silverio Montanari (INFN-Pavia)
    • 14:20 14:30
      Cost estimate for connection of magnet to cryogenic system and cool-down 10m
      Speaker: Renzhuo Wang (SLAC)
    • 14:30 14:40
      Cost estimate for obtaining ORC and performing low-current magnet testing 10m
      Speaker: Michael Tartaglia (Fermilab Technical Division)
    • 14:40 14:50
      Cost estimate for supporting installation of inner tracking elements inside magnet 10m
      Speaker: Claudio Silverio Montanari (INFN-Pavia)
    • 14:50 15:00
      Cost estimate for transporting magnet from DAB to Near Detector Facility 10m
      Speaker: Mike Dinnon (Fermilab)