Please read these instructions before posting any event on Fermilab Indico

The FERMI(FNAL) network authorization method has been removed. See news for more details.

Resources for Magnet Test and Installation at DAB

US/Central
    • 14:00 14:10
      Cost estimate for installation and commissioning of cryogenic system 10m
      Speaker: David Montanari (Fermilab)
    • 14:10 14:20
      Cost estimate for receiving magnet at DAB 10m
      Speaker: Claudio Silverio Montanari (INFN-Pavia)
    • 14:20 14:30
      Cost estimate for connection of magnet to cryogenic system and cool-down 10m
      Speaker: Renzhuo Wang (SLAC)
    • 14:30 14:40
      Cost estimate for obtaining ORC and performing low-current magnet testing 10m
      Speaker: Michael Tartaglia (Fermilab Technical Division)
    • 14:40 14:50
      Cost estimate for supporting installation of inner tracking elements inside magnet 10m
      Speaker: Claudio Silverio Montanari (INFN-Pavia)
    • 14:50 15:00
      Cost estimate for transporting magnet from DAB to Near Detector Facility 10m
      Speaker: Mike Dinnon (Fermilab)