Please read these instructions before posting any event on Fermilab Indico

Indico will be down for maintenance on Thursday, May 16th from 6:00PM - 8:00PM CST.

LBNE Near Site Cost and Schedule Review

US/Central
Fermilab

Fermilab

Description
<style type="text/css"> @font-face { font-family: "Calibri"; }p.MsoNormal, li.MsoNormal, div.MsoNormal { margin: 0in 0in 0.0001pt; font-size: 11pt; font-family: Calibri; }.MsoChpDefault { font-size: 11pt; font-family: Calibri; }div.WordSection1 { page: WordSection1; }</style> Assess the status and adequacy of the cost and schedule based on the conceptual design for LBNE Beamline, Near Detector, and the associated Conventional Facilities (CF) at the Near Site (Fermilab).  This review is to identify areas of weakness, and to recommend actions necessary to bring these elements to the level required for a successful DOE CD-1 review, currently planned for spring 2012.

Further information and background documentation can be accessed from the review web page.
For assistance please contact : Sonya Wright
  • Tuesday, 24 January
    • 1
      Committee Executive Session WH1N

      WH1N

      Fermilab

    • 2
      Welcome and LBNE Overview WH1W

      WH1W

      Fermilab

      Speaker: Elaine McCluskey (Fermilab)
      Slides
    • 3
      Near Site Conventional Facilities WH1W

      WH1W

      Fermilab

      Speaker: Mr Tracy Lundin (Fermilab)
      Slides
    • 10:00
      Break
    • 4
      Beamline Overview WH1W

      WH1W

      Fermilab

      Speaker: Dr Vaia Papadimitriou (Fermilab)
      Slides
    • 5
      Near Detector Overview WH1W

      WH1W

      Fermilab

      Speaker: Christopher Mauger (LANL)
      Slides
    • 6
      Cost/Schedule Overview WH1W

      WH1W

      Fermilab

      Speaker: Robert O'Sullivan (FNAL)
      Slides
    • 12:00
      Lunch
    • Beamline Cost/Schedule: PB, NB WH1N

      WH1N

      Fermilab

      (includes System Integration)

      • 7
        Beamline Cost/Schedule Overview
        Speaker: Dr Vaia Papadimitriou (Fermilab)
        Slides
      • 8
        Cost/Schedule Methodology
        Speaker: Robert O'Sullivan (FNAL)
        Slides
      • 9
        Schedule Walkthrough
        Speaker: Robert O'Sullivan (FNAL)
        Slides
      • 15:00
        Break
    • CF at Near Site Cost/Schedule: CF WH5NE conFESSional

      WH5NE conFESSional

      Fermilab

      • 10
        CF Cost Drivers
        Speaker: Mr Tracy Lundin (Fermilab)
        Slides
      • 11
        Cost Traceability Walkthrough
      • 14:45
        Break
      • 12
        Schedule Walkthrough
    • Near Detector Cost/Schedule: ND WH1E

      WH1E

      Fermilab

      • 13
        ND Prjt Cntrls, RLS, Cobra
        Speaker: Dan Jones
        Slides
      • 14
        Near Detector Cost/Schedule Overview
        Speaker: Christopher Mauger
        Slides
      • 15
        Beamline Measurements
        Speaker: Dr Geoffrey Mills (LANL)
        Slides
      • 16
        LArTPC Tracker
        Speaker: Glenn Horton-Smith (KSU)
        Slides
      • 17
        Neutrino Detector
        Speaker: William Louis (LANL)
        Slides
      • 14:40
        Break
      • 18
        Neutrino Detector Magnet
        Speaker: David Lee (LANL)
        Slides
      • 19
        DAQ/Computing
        Speaker: Hans Berns
        Slides
      • 20
        Discussion
    • Beamline Cost/Schedule: NB WH7X Racetrack

      WH7X Racetrack

      Fermilab

      (includes System Integration)

      • 21
        Remote Handling
        Speaker: Mr Patrick Hurh (FNAL)
        Slides
      • 22
        Targetry
        Speaker: Dr Bob Zwaska (Fermilab)
        Slides
      • 23
        Target Shield Pile
        Speaker: andy stefanik (fermilab)
        Slides
      • 24
        Horns
        Speaker: James Hylen
        Slides
    • Beamline Cost/Schedule: PB WH1N

      WH1N

      Fermilab

      (includes System Integration)

      • 25
        Magnets
        Speaker: Dr Gueorgui Velev (FNAL TD/MS)
        Slides
      • 26
        Magnet Power Supplies
        Speaker: Mr Steven Hays (AD E/E Support)
        Slides
      • 27
        LCW
        Speaker: Karl Williams (Fermilab)
        Slides
    • 28
      Committee Executive Session WH1N

      WH1N

      Fermilab

    • 29
      Questions from the Committee for the Project WH1N

      WH1N

      Fermilab

  • Wednesday, 25 January
    • 30
      Answers to Questions WH8X

      WH8X

      Fermilab

      Slides
    • Beamline Cost/Schedule: NB WH8X

      WH8X

      Fermilab

      (includes System Integration)

      • 31
        Installation
        Speaker: Rich Andrews
        Slides
      • 32
        Cost/Schedule Drilldowns
    • Beamline Cost/Schedule: PB Linac North Bungalow

      Linac North Bungalow

      Fermilab

      (includes System Integration)

      • 33
        Controls
        Speaker: Gregory Vogel (AD/Acc. Controls)
        Slides
      • 34
        Cost/Schedule Drilldowns
    • CF at Near Site Cost/Schedule: CF WH12X

      WH12X

      Fermilab

      • 35
        Cost/Schedule Drilldowns
    • Near Detector Cost/Schedule: ND WH12SW

      WH12SW

      Fermilab

      • 36
        Cost/Schedule Drilldowns
    • 10:00
      Break
    • Beamline Cost/Schedule: PB, NB WH8X

      WH8X

      Fermilab

      (includes System Integration)

      • 37
        Subcommittee Session & Report Writing
    • CF at Near Site Cost/Schedule: CF WH12X

      WH12X

      Fermilab

      • 38
        Subcommittee Session & Report Writing
    • Near Detector Cost/Schedule: ND WH12SW

      WH12SW

      Fermilab

      • 39
        Subcommittee Session & Report Writing
    • 12:00
      Lunch
    • 40
      Committee Report Writing & Dry Runs WH8X

      WH8X

      Fermilab

    • 41
      Closeout WH8X

      WH8X

      Fermilab