Switchyard/Meson/NM meeting

US/Central

SY

  • Rad fencing in F-sector due to construction Adam

  • VH94 SMPS upgrade: Commissioning soon. Adam

  • Startup checklist Adam

 

Meson

  • MS2LCW pumps

    • Pump #1 trips on over-current on startup Mike

    • Pump #3 needs new motor, waiting on parts

    • MSD to size pump and procure hose. Parts arrived. Adam

    • Upstream M02 leak not repairable without draining system. MSD to tighten valve stem to see if it helps.

  • MS2LCW head pressure, tank levels. Appears that gas bottle for head pressure is empty, could be cause of level rise. Gordon

  • MS3 vacuum PLC progress: Mike

    • Paul A. and Mike to look into installing CT clamps on vacuum pump cables.

      • Mike getting drawing from Dan, then CTs from Paul K., then installing.

  • MC6D-2

    • When MS2LCW is back on, leak check MC6D-2 and look for any regulators or restrictors

  • MC6D-4

    • Check leak once MS2LCW system is back on.

  • F1 single-point LOTO: work finished. Ops working on config control paperwork approval from ES&H. Paul

  • Need to remove dehumidifiers (F2 and F3) once MS2LCW up and running. Paul

  • M01 rad fence needs straightened out, solution with FESS confirmed to not count as excavation (concrete supports). Job finished, waiting on confirmation from ES&H. Tom

  • Startup checklist Mike

  • SWIC cable ringer to verify, in particular, MC6WC at low intensity (1E6), check cables. Specs from McArthur, ordering parts. Mike

  • Can SWICs run in Proportional mode (higher voltage, PWCs?), does polarity matter? From Dan: can go as high as 2200V, no change to polarity. Adam check MCenter Droeges can go this high.

  • Double-check Tom’s optics for MCenter 120 GeV mode Adam and Mike

 

NM

  • Vacuum

    • All pumps hooked up, downstream pump needs turned on.

    • NM2 multiwire leaking, Carol following up w/ MSD.

  • How many interaction lengths at this vacuum level in NM beamline? Carol

  • NS2LCW, backup pump (pump #2) pending

  • NS1LCW system status? Des agrees to have Dan jog the system. Adam

  • Magnet labels/signs; Enclosure C finished, taking longer than anticipated. Adam and Mike

  • Some rack labels needed Adam  

  • G2 single-point LOTO electrical work finished. Working with Ops on config control paperwork; waiting on ES&H to approve forms. Paul

  • NS2LCW sprayers developed a leak, Adam and Kevin about timeline for colder water, help MSD manage manpower.