g-2 Test Station Meeting w/ EE support for 12hz test

US/Central
Penthouse (Booster West Tower 2nd floor) (Universe)

Penthouse (Booster West Tower 2nd floor)

Universe

Meeting Notes:  1/24/2012    Still, Leveling, Wolff

Dean and Tony explained the type of the pulse testing that is needed to gain confidence in the lens for the g-2 pulse scenario.   Explained that a 12Hz average pulse test will need to be accomplished and maybe a modification to the test power supply to pulse at the g-2 scenario.    Because Howie and Ken were not present we decided to have an addition meeting.



Meeting Notes: 1/31/2012  Still, Leveling, Wolff, Pfefer, Bourkland

Meet to discuss details for completing the 12Hz test.
Calculated these would be the values that we are attempting to achieve:

Len Power Supply Estimates for Running 12Hz
Inverter freq (hz) Len I (KA) discharge pulse rate (Hz)
149 62.6 .5
14.9 22.6 .5
357.6 22.6 12

Max Inverter setting is 2500 Hz

Discussed if command into Inverter board could be modified and it is now believed it can in order to direct control.
Discussed if there were other parts of the Lens power supply that needed to be modified to accomidate the 12Hz
test.   It was decided that the firing pulse board should be tested and some of the resistors changed to compinsated for extra power.

Procedure for testing:   ( Could start as soon as Tue Feb 7)
1) Test firing board.
2) Modify NIM module with new chip to run 12Hz.
3) Run supply at 10Hz and low output I (KA) at 12Hz
4) Check items in power supply for heat/ thermal problems.





There are minutes attached to this event. Show them.
    • 1
      Lens Pulse Testing Plan
      Speaker: Still
      more information
      Slides