Please read these instructions before posting any event on Fermilab Indico

Indico will be unavailable on Wednesday, Nov 20th from 7-7:30 CST due to server maintenance.

Tianlai Analysis Teleconference

US/Central
Peter Timbie, Peter Timbie (UW-Madison)

Minutes

See Olivier's attached presentation about Cas A transit analysis

Xuelei:  2 more dishes will be installed.  12m diameter.  They will provide longer baselines for calibration.  Probably  1 near the current site and one at one of the new cylinder sites, about 2 km away from current site.   (If it's too far, Cas A will be resolved.   But other, dimmer sources would not be and could be used for calibration instead.

Will expand the correlator to allow correlations between all antennas.

This would be a good opportunity to consider lower sidelobe antenna designs, possibly as a precursor to new feeds on all the dishes. 

Ue-Li coming to visit.  Interested in having many dishes made (for CHORD?)

There are minutes attached to this event. Show them.