Please read these instructions before posting any event on Fermilab Indico
Indico will be unavailable on Wed., Dec 18th from 7 - 7:30am due to server maintenance.
NOvA running well. Took advantage of Wednesday beam downtime to do some Far Detector maintenance. This morning, MINOS monthly elevator maintenance. Were able to do MINOS electrical panel work on Wednesday downtime (remember this took down several racks which included beam permit and some upstream stuff), thanks everyone for working with us on that, very good for QUIET. Unfortunately, some unforeseen consequences for NEXUS in that their power went down too. It was missed that they were on one of those circuits. Obviously that wasn’t what we wanted and while we wereable to arrange the work and get power back on to prevent issues, we’re working to prevent this in the future. ArgonCube is continuing work and installation underground, working on some cryo-related equipment.