DAQ Coordination Meeting

America/Chicago
    • 1
      General news
      Speakers: Alessandro Thea (STFC Rutherford Appleton Laboratory), Asher Kaboth (RHUL), Roland Sipos (CERN)
    • 2
      Actions from previous meetings
      Speakers: Alessandro Thea (STFC Rutherford Appleton Laboratory), Asher Kaboth (RHUL), Roland Sipos (CERN), Wesley Ketchum (Fermi National Accelerator Laboratory)
    • 3
      Run Coordination news
      Speaker: Wesley Ketchum (Fermi National Accelerator Laboratory)
    • 4
      Activity coordination round table

      Release Coordination v4
      Release Coordination v5
      Iceberg
      ND test setups
      SW coordination

      Speakers: Bonnie King (FNAL), Eric Flumerfelt (Fermilab), John Freeman, Kurt Biery (Fermilab), Wesley Ketchum (Fermi National Accelerator Laboratory)
    • 5
      Working groups round table
      Speakers: Adam Barcock (UKRI STFC), Alec Habig (Univ. of Minnesota Duluth), Alexander Tapper (Imperial College London), Artur Sztuc (University College London), Bonnie King (FNAL), David Cussans (University of Bristol), Jonathan Hays (Queen Mary University of London), Joshua Klein, Kurt Biery (Fermilab), Pierre Lasorak (Imperial College London), Roland Sipos (CERN), Stoyan Trilov, Wesley Ketchum (Fermi National Accelerator Laboratory)

      CCM

      Current running

      • Update to electronic logbook access in nanorc

      Run control

      • FSM sequences (multiple transitions in one go)
      • eLisa integration 
      • Usability requests need to be prioritised for release (done?)
      • GUI work (from 1st July)

      Configuration

      • Support of OKS integration

      Monitoring

      • Review of the Opmon API by Roland and Eric
      • Various dashboard housekeeping items

      Trigger

      • New MLT feature: allowing different readout windows for different detector types (TPC, PDS, CRT etc).
      • New MLT feature: option to discard TriggerCandidates that overlap with already-made TriggerDecision (e.g. pileup)
      • Ongoing TPG tests: StandardThreshold algorithm allows for lower ADC thresholds than StandardRS on the np04 computing resources.
      • Ongoing comparisons of tpg algorithms.

       

      Timing

      Hardware:

      • FIB v2 ( pre-production ) boards due in Bristol 20/July (couple of day's delay due to BoM error. Some rework in house will be needed)
      • MIB v3 (pre-production ) design finished. Waiting for completion of MIB v2 debugging before manufacture (some h/ware bugs discovered in process of debugging MMC, want to check there aren't any more)
        • I2C link between crate controller and module management uController established. MIB MMC can negotiate with MCH/PSUs. ---> No longer need external PSU to power MIB in crate. Temperature/Current/Voltage sensors being commissioned.
      • Request for quotes for "DUNE variant" AFCs sent out. No reply from Creotech yet. three "decline to quote".
      • "VD TDE" design uTCA crate due in Bristol ~ end of July

      ProtoDUNE:

      • Clock/timestamp being received by all readout/calibration units on NP04
      • Return path working on CALCI , CTB and DAPHNE
        • SSP return path not working. WIBs need updated f/ware
        • Running "endpoint monitoring service" with subset of endpoints.
      • No "show stopping" issues reported so far.....
      • Restarted 10MHz/1PPS to VD TDE. E-mailed Dario requesting check. No reply yet.
      • On site hardware support schedule almost final. Setting up "expert on call" (CERN)Phone line in progress.
      • For NP02 we will use splitters with ST (rather than LC connectors) to avoid continual problems with UPC fibres being plugged into APC splitters.

      Firmware:

      • Debugging GIB f/ware restarting (IRIG time stamp setting)

      DUNEDAQ:

      • Porting to OKS continues ( Work on 5.x release)

       

    • 6
      Actions