Timing System Meeting

Europe/London
Description

Topic: Timing System Meeting
Time: Sep 26, 2024 03:00 PM London

Join Zoom Meeting
https://cern.zoom.us/j/65611907988?pwd=ak9jK04xdFY0OThzN3RRbEdVZkhNZz09

Meeting ID: 656 1190 7988
Passcode: 959532
One tap mobile
+33170372246,,65611907988# France
+33170379729,,65611907988# France

Dial by your location
        +33 1 7037 2246 France
        +33 1 7037 9729 France
        +33 1 8699 5831 France
        +41 31 528 09 88 Switzerland
        +41 43 210 70 42 Switzerland
        +41 43 210 71 08 Switzerland
        +44 131 460 1196 United Kingdom
        +44 203 481 5237 United Kingdom
        +44 203 481 5240 United Kingdom
Meeting ID: 656 1190 7988
Find your local number: https://cern.zoom.us/u/cUwyxIgTf

Join by SIP
65611907988@188.184.89.188
65611907988@188.185.118.153

Join by H.323
188.184.89.188
188.185.118.153
Meeting ID: 656 1190 7988
Passcode: 959532

    • 15:00 15:15
      Pre-production hardware/PRR preparation 15m

      DUNE AFC v4 status

      MIB v3 status

      MIB tongue v2 status

      FIB v2 status

      GIB v2 status

      Schedule status

      Documentation status

      Speakers: David Cussans (University of Bristol), Stoyan Trilov, Sudarshan Paramesvaran

      GIB: requisition raised, will turn to PO next week, delivery ~end of January

      MIB: delivery mid-January

      FIB: complete testing next year

      AFC: modifications due next year

      MIB tongue 2: action against DC to talk to Pete about MIB tongue v2

      GIB FPGA carrier: agenda item for next year

      Schedule: hardware schedule leading to shipment complete

      PRR: end of April looks to be acceptable

      PRR documentation: DC working on electrical safety review documents, end of year/early next year

    • 15:15 15:20
      Timestamp initialisation 5m
      Speakers: David Cussans (University of Bristol), Stoyan Trilov

      Complete, firmware and software feature branches merged

    • 15:20 15:25
      Fine phase measurement 5m
      Speakers: David Cussans (University of Bristol), Stoyan Trilov

      Work on-going

    • 15:25 15:30
      TAI IRIG epoch 5m
      Speaker: Stoyan Trilov

      On-hold, waiting for

      1. functional GIB

      2. Control of fine phase blocks in AFC/FIB

      3. IRIG source -  may need buy GPS oscillator

      action: DC to ask JK about spare GIB in Penn. DC/ST will look at GIB in lab

    • 15:30 15:35
      DTS HSI op-mon 5m
      Speakers: Diana Antic (University of Bristol), Stoyan Trilov

      DA has draft PR, working on configuring the lab hardware, next steps are to look at dashboards

    • 15:35 15:40
      DTS service software 5m
      Speaker: Stoyan Trilov

      24/Nov

      No update

      (ST aiming to have requirements document out for comment by end of year)

      ----------------------------

      ST: May have to de-scope design of timing as service

      -------------------------

      Notes from 14/Nov

      ST: Pierre and ST discussed this 

      ST presented outcome of discussion at CCM meeting. Not clear if audience understood issues involved.

      Action: ST and PL to update spec in light of feedback from presentation.

      For PRR should have design for this (UML diagram)

       

    • 15:40 15:50
      Endpoint on Ultrascale+ fabric 10m
      Speakers: David Cussans (University of Bristol), Jean-Pierre Martin (Universite de Montreal (CA)), Jean-Pierre Martin (Universite de Montreal (CA))

      JPM to check if nexys board available locally and possible purchase, if not possible "faulty" nexys board to be found in Bristol lab

    • 15:50 15:55
      Operations support 5m

      NP02

      FMC needs

      Speakers: David Cussans (University of Bristol), Dennis Lindebaum (University of Bristol), Diana Antic (University of Bristol), Stoyan Trilov

      NP02 CRT: DC to schedule call with Jose to debug FMC+Enclustra

      CERN GIB+PC059: Wes connected GIB to PC059, DTS link looks OK

      NP02: DC action to order CERN SFP

      FMCs: DC/ST to prepare change request

    • 15:55 16:00
      AOB 5m

      Round table: