Please read these instructions before posting any event on Fermilab Indico
Indico will be unavailable on Monday Feb 17th from 4:30-5PM CST due to server maintenance.
Cover physics aspects of detector as Andrew Sutton did in the first internal review. Choice of bar length and width, detector width and height, cassette concept, external 8-fiber connector connected to mating block w/ 8 SiPM PCB. 10 wire connector with LED and temperature measurement. 40 min talk, 20 min for questions.
Include prototyping plan and QA/QC procedures for detectors and cassettes.
Procurements required, assembly steps, assembly throughput, 2-factory plan.
LV distribution, grounding considerations, fringe field concerns.