Please read these instructions before posting any event on Fermilab Indico

Indico will be unavailable on Wed., Dec 18th from 7 - 7:30am due to server maintenance.

28–30 Apr 2014
Fermi National Accelerator Laboratory
US/Central timezone

Activation Products from Copper and Steel Samples Exposed to Showers Produced by 8 GeV Protons Lost at the Fermilab Main Injector Collimation System

28 Apr 2014, 15:15
25m
Curia II

Curia II

Speaker

Bruce C. Brown (Fermilab/Accelerator Div/Main Injector Dept)

Description

In conjunction with efforts to predict residual radiation levels, measurements of residual radiation were correlated with the time history of losses. Detailed examination suggested that the list of radioactive isotopes used for fitting was incomplete. We will report on activation studies of magnet steel and copper samples which we irradiated adjacent to the Fermilab Main Injector collimation system. Our results identified several additional radioactive isotopes of interest including ones due to small isotopic and small chemical components with disproportionate contributions to the residual radiation. The MARS15 studies using both realistic and simplified models have confirmed our understanding of these measurements. The long half-life isotopes will grow in importance as operation stretches to a second decade and as loss rates rise. These studies allow us to predict limits on these concerns.

Summary

This presentation will build on the radiation control efforts for the Fermilab Main Injector by examining the activation of materials for the magnet systems which experience activation by 8 GeV beam loss. Activation studies with samples of steel and copper exposed them to the radiation near one of the secondary collimators allow presentation of measured results and comparisons with MARS15 calculations. The cooldown studies at bar-coded residual radiation measurement locations will provide a framework for relating these measurements to the overall effort to quantitatively predict and understand radiation exposures during upgrade and maintenance efforts in the Main Injector tunnel.

Primary author

Bruce C. Brown (Fermilab/Accelerator Div/Main Injector Dept)

Co-authors

Presentation materials