Cold Electronics Mechanical PRR

America/New_York
3-209B (BNL Physics (510))

3-209B

BNL Physics (510)

Hucheng Chen (Brookhaven National Lab), Kevin Fahey (LBNF), Matthew Worcester (BNL), Regina Rameika (Fermilab)
Description

Production Readiness Review of the ProtoDUNE-SP CE Mechanicals


Review Information
Review Home

Charge Letter

https://zoom.us/j/8322964409.
Final Report
Support
    • 1
      Tour of CE lab and High-bay 1-216

      1-216

      BNL Physics (510)

    • 2
      Discussion of CE Electricals QA/QC 3-209B

      3-209B

      BNL Physics (510)

    • 3
      Lunch (on your own) 3-209B

      3-209B

      BNL Physics (510)

    • 4
      Introductions 3-209B

      3-209B

      BNL Physics (510)

    • 5
      Design Status (Grounding Issues) 3-209B

      3-209B

      BNL Physics (510)

      Speaker: Matthew Worcester (BNL)
      Slides
    • 6
      Review the Production Readiness Review Checklist 3-209B

      3-209B

      BNL Physics (510)

    • 7
      Review the CE Mechanicals PRR Checklist 3-209B

      3-209B

      BNL Physics (510)

    • 8
      Review production plans and manufacturing procedures 3-209B

      3-209B

      BNL Physics (510)

    • 9
      Review handling/storage/packaging/shipping plans 3-209B

      3-209B

      BNL Physics (510)

    • 10
      Review QC Plan Status 3-209B

      3-209B

      BNL Physics (510)

      Speaker: Matthew Worcester (BNL)
      Slides
    • 11
      Review the ESH requirements 3-209B

      3-209B

      BNL Physics (510)

    • 12
      Summary/Recommendations 3-209B

      3-209B

      BNL Physics (510)

    • 13
      Dinner (on your own) 275 NY-25A # 1 Miller Place, NY 11764 (Don Quijote Restaurant)

      275 NY-25A # 1 Miller Place, NY 11764

      Don Quijote Restaurant