Quiet week. Laser Notcher commissioning could begin by the end of next week.
Booster
Install BRF21 in the Booster tunnel. Back to running on the VME low level RF card. See slides.
Main Injector & Recycler
MI52 vacuum issues have been repaired. Problems with RRF01, experts are investigating. See slides.
NuMI
Running well. Horn A power supply has been repaired.
NuMI Experiments
Running well. Now running on new Fiber Timing cable.
Booster Neutrino
Runningt well. Air flow issues are being looked at.
BNB Experiments
Running well.
MTA
Modular cavity run continues.
SY120, Neutrino Muon, Meson Test, Meson Center
F2 sump discharge line was repaired. Wiil need to access F2 manhole to verify normal operation.
SY120 Experiments
Running well. Three experiments are installed in MTest. An experiment will install in M03 next Wednesday.
FAST
New cave interlock system tested. Have permission to power magnets.
PIP-II Injector Test
Continuing with shutdown installation. Installing cavity 111 at Meson Detector Building.
Alignment
Supported Booster, Muon Campus, Fast and Pip II.
Controls
Nothing to report.
Cryo
Replaced the Kiney skid at Meson Cryo. CMTF and MTA are cold. NML system is being worked on.
ES&H
We are investigating air flow issues at MI-12.
EE Support
Nothing to report.
Instrumentation
Nothing to report.
Mechanical & Fluids
Found a few ion pumps tripped in Booster and the Recycler ring. MI-52 Septa vacuum is looking good.
RF
RRF01 investigation continues.
FESS
Repaired 2 breaks in the F2 Sump discharge pipe. SLI work continues at Swan lake and Casey's pond.
Used at camera in the MI-52 sump discharge line to verify that the line is broken. A sump pump at MI-62 needs to be replaced. Repaired a Booster exhaust fan. Work continues on MInos chillers.
There are minutes attached to this event.
Show them.
1
Crew ChiefCuria II
Curia II
Wilson Hall
Slides
2
Operations CoordinatorCuria II
Curia II
Wilson Hall
3
LinacCuria II
Curia II
Wilson Hall
Quiet week. Laser Notcher commissioning could begin by the end of next week.
4
BoosterCuria II
Curia II
Wilson Hall
Slides
Install BRF21 in the Booster tunnel. Back to running on the VME low level RF card. See slides.
5
Main Injector & RecyclerCuria II
Curia II
Wilson Hall
Slides
MI52 vacuum issues have been repaired. Problems with RRF01, experts are investigating. See slides.
6
NuMICuria II
Curia II
Wilson Hall
Running well. Horn A power supply has been repaired.
7
NuMI ExperimentsCuria II
Curia II
Wilson Hall
Running well. Now running on new Fiber Timing cable.
8
Booster NeutrinoCuria II
Curia II
Wilson Hall
Runningt well. Air flow issues are being looked at.
9
BNB ExperimentsCuria II
Curia II
Wilson Hall
Running well.
10
Muon RingsCuria II
Curia II
Wilson Hall
Slides
11
MTACuria II
Curia II
Wilson Hall
Modular cavity run continues.
12
SY120, Neutrino Muon, Meson Test, Meson CenterCuria II
Curia II
Wilson Hall
F2 sump discharge line was repaired. Wiil need to access F2 manhole to verify normal operation.
13
SY120 ExperimentsCuria II
Curia II
Wilson Hall
Running well. Three experiments are installed in MTest. An experiment will install in M03 next Wednesday.
14
FASTCuria II
Curia II
Wilson Hall
New cave interlock system tested. Have permission to power magnets.
15
PIP-II Injector TestCuria II
Curia II
Wilson Hall
Continuing with shutdown installation. Installing cavity 111 at Meson Detector Building.
16
AlignmentCuria II
Curia II
Wilson Hall
Supported Booster, Muon Campus, Fast and Pip II.
17
ControlsCuria II
Curia II
Wilson Hall
Nothing to report.
18
CryoCuria II
Curia II
Wilson Hall
Replaced the Kiney skid at Meson Cryo. CMTF and MTA are cold. NML system is being worked on.
19
ES&HCuria II
Curia II
Wilson Hall
We are investigating air flow issues at MI-12.
20
EE SupportCuria II
Curia II
Wilson Hall
Nothing to report.
21
InstrumentationCuria II
Curia II
Wilson Hall
Nothing to report.
22
Mechanical & FluidsCuria II
Curia II
Wilson Hall
Found a few ion pumps tripped in Booster and the Recycler ring. MI-52 Septa vacuum is looking good.
23
RFCuria II
Curia II
Wilson Hall
RRF01 investigation continues.
24
FESSCuria II
Curia II
Wilson Hall
Speakers:
Gilbert, Shirley, Sprosty
Repaired 2 breaks in the F2 Sump discharge pipe. SLI work continues at Swan lake and Casey's pond.
Used at camera in the MI-52 sump discharge line to verify that the line is broken. A sump pump at MI-62 needs to be replaced. Repaired a Booster exhaust fan. Work continues on MInos chillers.