AD Weekly Friday - 2017 Scheduling Meeting/Weekly Summary (05 May 2017)
Crew Chief
See slide. MI transductor electronics issue. Vacuum pump changout on RFQ. Tuning in progress.
Operations Coordinator
See Slide.
Linac
Referred to the RFQ vacuum pump replacement. Otherwise running well.
Booster
See slide. Running well.
Main Injector & Recycler
See slides. Discussion about MI-60N ground fault/buss work issues.
NuMI
Running well.
NuMI Experiments
Running well.
Booster Neutrino
Running well.
BNB Experiments
Running well.
Muon Rings
Working on shunts this morning. May take beam this afernoon. Still a number of things not ready for coasting beam in the Delivery ring. Good news - EE support able to pulse Pmag. Plan to take low power beam to target if applicable.
MTA
In between experimental runs, waiting for approval. Cavity is running successfully.
SY120, Neutrino Muon, Meson Test, Meson Center
Thanks to MI & MSD for vacuum work in MI-52 region. Tuesday Code 1 at SSB fire alarm for building ceiling heater failure. No damage at SSB other than the heater. Meson beamline off yesterday for experimets install. (M03 & MC6?) Commisioning of M03 exp. went well last night. Thanks to ops for beam setup & tuning. Installed temperature sensor on M01 target. FESS borescoped F2 sump line.
SY120 Experiments
Thanks to Michael & Adam for help with M03 experiment installation. Six (6) experiments installed! Maybe a record in MI Fixed target era.
FAST
Transverse profile monitor installation continues. Vacuum techs removed xray equipt. from 50 Mev line. Controller board for chiller died. New board installation today. ODH class 1 next week.
PIP-II Injector Test
Shutdown continues. Most girders are populated. Meson 3rd cavity installed & under vacuum. Maybe testing next week.
Alignment
Provided support for CMTF - Laser scanning.
Controls
Repeater power supply failure @ F-27.
Cryo
Meson frig is cold. Transfer line is filled with LHe. Vacuum running. Some issues with discharge water pressure, FESS is investigating. Decontam SGC. G-1 wet engine failed. Felts not properly filled with grease. CMTF is cold and running well. NML, FAST Lab B ready. MTA cold and running well.
ES&H
MI-12 investigation continues.
EE Support
Discussion about the MI transductor electronics replacement. MI 60 S water on floor, 2 hr opt
Instrumentation
Found problem with booster toroid, loose solder connection.
Mechanical & Fluids
IP829 faulted. MC7 chiller under repair. Under vac today adding refrigerant later.
RF
MI, RR & BRF running well.
FESS
Awaiting details on Comm Ed switch.
Summer Shutdown 2017
Still some manpower issues. Overall in fairly good shape. Short maybe 3 or 4 people. Worklist reminder.
Miscellaneous
Discussion on hot Comm Ed switch. See Slides. Main plan - shutdown & access day on Monday May 15th IF schedule holds up.
There are minutes attached to this event.
Show them.
1
Crew ChiefOne West
One West
Wilson Hall
Slides
See slide. MI transductor electronics issue. Vacuum pump changout on RFQ. Tuning in progress.
2
Operations CoordinatorOne West
One West
Wilson Hall
Slides
See Slide.
3
LinacOne West
One West
Wilson Hall
Referred to the RFQ vacuum pump replacement. otherwise running well.
4
BoosterOne West
One West
Wilson Hall
Slides
See slide. Running well.
5
Main Injector & RecyclerOne West
One West
Wilson Hall
Slides
See slides. Discussion about MI-60N ground fault/buss work issues.
6
NuMIOne West
One West
Wilson Hall
Running well.
7
NuMI ExperimentsOne West
One West
Wilson Hall
Running well.
8
Booster NeutrinoOne West
One West
Wilson Hall
Running well.
9
BNB ExperimentsOne West
One West
Wilson Hall
Running well.
10
Muon RingsOne West
One West
Wilson Hall
Working on shunts this morning. May take beam this afernoon. Still a number of things not ready for coasting beam in the Delivery ring. Good new - EE support able to pulse Pmag. Plan to take low power beam to target if applicable.
11
MTAOne West
One West
Wilson Hall
In between experimental runs, waiting for approval. Cavity is running successfully.
12
SY120, Neutrino Muon, Meson Test, Meson CenterOne West
One West
Wilson Hall
Thanks to MI & MSD for vacuum work in MI-52 region. Tuesday Code 1 at SSB fire alarm for building ceiling heater failure. No damage at SSB other than the heater. Meson beamline off yesterday for experimets install. (M03 & MC6?) Commisioning of M03 exp. went well last night. Thanks to ops for beam setup & tuning. Installed temperature sensor on M01 target. FESS borescoped F2 sump line.
13
SY120 ExperimentsOne West
One West
Wilson Hall
Thanks to Michael & Adam for help with M03 experiment installation. Six (6) experiments installed! Maybe a record in MI Fixed target era.
14
FASTOne West
One West
Wilson Hall
Transverse profile monitor installation continues. Vacuum techs removed xray equipt. from 50 Mev line. Controller board for chiller died. New board installation today. ODH class 1 next week.
15
PIP-II Injector TestOne West
One West
Wilson Hall
Shutdown continues. Most girders are populated. Meson 3rd cavity installed & under vacuum. Maybe testing next week.
16
AlignmentOne West
One West
Wilson Hall
Provided support for CMTF - Laser scanning.
17
ControlsOne West
One West
Wilson Hall
Repeater power supply failure @ F-27.
18
CryoOne West
One West
Wilson Hall
Meson frig is cold. Transfer line is filled with LHe. Vacuum running. Some issues with discharge water pressure, FESS is investigating. Decontam SGC. G-1 wet engine failed. Felts not properly filled with grease. CMTF is cold and running well. NML, FAST Lab B ready. MTA cold and running well.
19
ES&HOne West
One West
Wilson Hall
MI-12 investigation continues.
20
EE SupportOne West
One West
Wilson Hall
Discussion about the MI transductor electronics replacement. MI 60 S water on floor, 2 hr opt
21
InstrumentationOne West
One West
Wilson Hall
Found problem with booster toroid, loose solder connection.
22
Mechanical & FluidsOne West
One West
Wilson Hall
IP829 faulted. MC7 chiller under repair. Under vac today adding refrigerant later.
23
RFOne West
One West
Wilson Hall
MI, RR & BRF running well.
24
FESSOne West
One West
Wilson Hall
Speakers:
Gilbert, Shirley, Sprosty
Awaiting details on Comm Ed switch.
25
Summer Shutdown 2017One West
One West
Wilson Hall
Speaker:
MrCons Gattuso
(Fermi Lab)
Still some manpower issues. Overall in fairly good shape. Short maybe 3 or 4 people. Worklist reminder.
26
MiscellaneousOne West
One West
Wilson Hall
Slides
Discussion on hot Comm Ed switch. See Slides. Main plan - shutdown & access day on Monday May 15th IF schedule holds up.