Mr
Tracy Lundin
(Fermilab)
18/12/2017, 08:00
- dimensions including tolerances, details of the finishing of the walls and floor, doors
- what will be inside chamber (utilities), installed by CF (permanent and temporary utilities: lighting, ventilation, fire detection, fire protection, power distribution, grounding network, evacuation system alarm, phone and wifi …?
- which of these items still need better requirements? —>action
-...
Jack Fowler
(Duke University)
18/12/2017, 10:15
- what functions do cryostat, cryo systems, and FD need to accomplish with cranes?
- do we need for the duration of the installation of CF infrastructure, cryostat warm, cryostat cold, cryogenics, detector a set of dedicated and movable elevators? Which type? Who will be responsible?
- define an action plan for all of the above
Mr
Joshua Willhite
(Fermilab)
18/12/2017, 13:00
during the construction of the first 2 cryostats and cryogenics and detectors (caverns, drifts, surface building, …)
Prof.
Marzio Nessi
(CERN)
19/12/2017, 08:00
- Who comes next? Which space we will have underground. How access is possible (bridges, ..)
- First cold cryostat installation requirements in term of space, material lowering, logistics underground, scaffoldings, amount of people
- Second warm structure assembly in parallel? Which additional requirements?
- Which infrastructure should be installed at this moment in preparation of the...
Jack Fowler
(Duke University)
19/12/2017, 13:00
Dr
Eric James
(Fermi National Accelerator Lab)
19/12/2017, 14:00