Please read these instructions before posting any event on Fermilab Indico

Indico will be down for maintenance on August 8th from 6-7PM

23–26 Sep 2008
Fermilab, Batavia, IL
US/Central timezone

Commissioning of the CMS pixel barrel detector

23 Sep 2008, 10:55
25m
One West (Fermilab, Batavia, IL)

One West

Fermilab, Batavia, IL

Speaker

Ms Lea Caminada (CMS)

Summary

The CMS pixel barrel detector is a complicated system that consists of 768 modules, 1104 optical link channels connected to the 32 Front End Drivers (FEDs). In this talk the strategy and results from the commissioning of the complete readout chain will be presented. The general experience gained by operating the pixel barrel system, first at PSI and then after the connection to the final CMS data acquisition system, will be described. This includes hardware aspects, acquisition software, calibration tests and data analysis completed to ensure that pixel detector performs according to specifications.

Primary author

Ms Lea Caminada (CMS)

Presentation materials