9 AM Meeting

US/Central
Huddle

Huddle

Description
Accelerator Scheduling Meeting
    • 09:00 09:01
      Crew Chief Operations Summary 1m
      Slides
    • 09:01 09:02
      Linac 1m

      Linac is running good.  The 400MeV LCW skid has a leak.  

    • 09:02 09:03
      Booster 1m

      Currently running well.  Ran lots of beam over the weekend.  4.7e12ppp to NuMI, 4.4e12 ppp to Muon, and 4.1e12 ppp to BnB.

    • 09:03 09:04
      Booster Neutrino 1m

      Running Well

    • 09:04 09:13
      BNB Experiments 9m

      MicroBoone is running well.

    • 09:13 09:18
      Main Injector & Recycler 5m

      Running well.  Same studies request as last Friday.  Still looking at the MI52 septa and vacuum.

    • 09:18 09:19
      NuMI 1m

      Running well.  Suspect a helium leak on the target.

    • 09:19 09:20
      NuMI Experiments 1m

      Running well

    • 09:20 09:21
      Muon Rings 1m

      Good running over the weekend.  There were three nuisance trips on the dump water flow.  There are redundant sensors in the system and will maybe jumper this flow sensor.  During studies noticed 180Hz noise on I:HVF11.

    • 09:21 09:22
      Muon Experiments 1m

      Mixed weekend.  Had around 36 hours of very good running.  There was a trolley run and after the run the magnet dumped on a cryo input.  After recovery had to do another trolley run.  Also have problems with one of the kickers.

    • 09:22 09:23
      SY120 1m

      Running well

    • 09:23 09:24
      SY120 Experiments 1m

      One group in Mtest finished over the weekend.  One remaining group right now.  Will request beam when needed.

    • 09:25 09:26
      ES&H 1m

      There are chipmunk due for calibration.  These will need to be changed be for the end of the month.

    • 09:27 09:28
      EE Support 1m

      Will look at noise on I:HVF11 when the supply is available.

    • 09:28 09:29
      Mechanical 1m

      Have done a temporary patch on the 400MeV LCW skid to stop a leak. 

    • 09:29 09:30
      Fluids 1m
    • 09:30 09:31
      RF 1m

      All system look good.

    • 09:32 09:33
      Controls 1m

      OPS replace a C190 card at AP50 that failed over the weekend.

    • 09:33 09:34
      Instrumentation 1m

      Nothing

    • 09:34 09:35
      FESS 1m

      Bring cooling and AC units on line for summer running.  Chiller 4 repairs are done and it should be available by the end of the week.  The annual valve exercising has started. 

    • 09:36 09:37
      Miscellaneous 1m
    • 09:55 09:56
      MTA 1m