This review of the PIP-II Utility Plant (WBS 121.06.04) will review the current state of the design to ensure that the appropriate requirements have been addressed.
The PIP-II Utility Plant will provide the mechanical infrastructure to support the installation, commissioning and operation of the process water equipment for the PIP-II accelerator components.
The PIP-II Utility Plant includes the elements of work normally included in conventional construction such as earthwork, utilities, structural concrete, structural steel, architectural cladding, finishes, roofing, plumbing, process piping, heating ventilation and air conditioning (HVAC), fire protection, fire detection, lighting and electrical. The outcome of the review is to ensure that the documented requirements have been incorporated into the design at an appropriate level for this stage of the project development.