Second meeting added to allow complete material coverage.
Zoom link in email invitation
Hi,
I propose to have a meeting to:
Check that the current transport box design allows the insertion of the PD modules. The photon detector slots are clear, but how much space is needed for the PD module installation? Is there any jig to help the insertion, which would require some space?
We need an interface drawing for the installation of the rails and the connectors on the middle tube that would clearly show all the tolerances on the APA and the PDS sides.