Please read these instructions before posting any event on Fermilab Indico
Indico will be down for a brief server restart on Friday Jan 24th at 5PM CST. The downtime will be 15min at most.
Review / Update of DSS design and interfaces
Update of HV detector elements to reflect warm and cold changes
Proposed drawings / models for warm and cold detector