DAQ Coordination Meeting

America/Chicago
    • 08:00 08:05
      General news 5m
      Speakers: Alessandro Thea (STFC Rutherford Appleton Laboratory), Asher Kaboth (RHUL), Roland Sipos (CERN)
    • 08:05 08:20
      Actions from previous meetings 15m
      Speakers: Alessandro Thea (STFC Rutherford Appleton Laboratory), Asher Kaboth (RHUL), Roland Sipos (CERN), Wesley Ketchum (Fermi National Accelerator Laboratory)
      1. Josh/Artur: draft proposal for NP04 trigger bits
      2. Josh: prepare poll for alternative PP/DS slot
      3. Alessandro: poll for planning workshop times in May
      4. Adam, Alessandro, Roland: sketch out PRR structure
      5. Alessandro, Bonnie, Wes: follow up on just-in-time deployments
    • 08:20 09:00
      Preparation for the Planning Workshop 40m
      Speakers: Alessandro Thea (STFC Rutherford Appleton Laboratory), Asher Kaboth (RHUL), Roland Sipos (CERN), Wesley Ketchum (Fermi National Accelerator Laboratory)
    • 09:00 09:30
      Working groups round table 30m
      Speakers: Adam Barcock (UKRI STFC), Alec Habig (Univ. of Minnesota Duluth), Alexander Tapper (Imperial College London), Artur Sztuc (University College London), Bonnie King (FNAL), David Cussans (University of Bristol), Jonathan Hays (Queen Mary University of London), Joshua Klein, Kurt Biery (Fermilab), Pierre Lasorak (Imperial College London), Roland Sipos (CERN), Stoyan Trilov, Wesley Ketchum (Fermi National Accelerator Laboratory)

      Timing

      Last week

      • Preparations for interim PRR for AFCs (writing talks, clarifying some details, practice on Wednesday)
      • interim PRR (Friday). Most significant questions about choice of vendors and how to ensure vendor competent
      • Firmware to capture timing messages arriving at endpoint and produce HSI data.
      • Testing the fddaq-v4.4.0 in timing system hardware.

      This week

      • Review FIB v2 design
      • Continue with OKS for timing configuration
      • Finish v4.4.0 release testing
      • Support for PD2 ramp-up

      CCM

      • Control
        • Nanorc -- request from Alessandro on login pending
        • Drunc -- struggling a bit with how the information is organised in OKS. Retain support for daqconf?
        • Discussions with RSE group on GUI work
        • New post-doc Pawel Plesniak started a week ago -- will work on run control and spend time at CERN for PD
      • Config
        • OKS meetings ongoing 
        • Collection of tags for engineering release
      • Kubernetes
        • Microservices:
          • Timezone in the run registry/number wrong -- Geneva time but labelled GMT -- solution to store UTC.
          • Disconnection from the DB every 24 hours -- now renews every hour.
        • K8s testing
          • Long runs without problems (or better without k8s problems)
          • Plan multiple new run tests.
        • K8s PM
          • Basic tests with PODs
          • Discussion of UUIDs for processes in k8s vs ssh.
      • Monitoring -- Marco away. Very minor activities (see Slack).

       

      DQM

      Poll out for new time: likely Thursdays at 18:00 CEST / 11:00 CDT

       

      Readout

      Sync issue has been resolved. 

      10 GbE emulator butler is currently being updated to enable sweep over packet size and link utilisation.

      40 GbE emulator butler is being constructed from existing scripts.

      Obtained help and example documentation to inform decision on how to structure report of PRR.

      Planning switch testing programme informed by restriction in UK funding and power analysis results.

       

    • 09:30 10:00
      Activity coordination round table 30m

      Release coordination
      Iceberg
      ND test setups
      EHN1 integration
      SW coordination

      Speakers: Bonnie King (FNAL), John Freeman, Kurt Biery (Fermilab), Patrick Dunne (Imperial College London), Wesley Ketchum (Fermi National Accelerator Laboratory)

      Release Coordination (Kurt):

      • To be decided:
        • when to create the final build for fddaq-v4.4.0
        • how to handle fddaq-v4.5.0 (how to manage what gets included when)

      EHN1 Run Coordination (Wes):

      • NP04 expected to be full the week of April 29 (next week)

      • High priority NP04 preparation work

        • PDS + SSP/LED calibration

        • Data challenge with offline computing to be going on this week

          • Configurations prepared without using np04-srv-005 nvme drives, but will attempt to run tests with those as well

        • I am late to get a better fleshed out NP04 expert shift calendar / planning – working on it, and will distribute soon

      • NP02 coldbox to be finished at the latest by Thursday

        • Do we have requests for data between now and then? If not, we can give our ok to end things earlier.

      • Proposed DAQ cluster access form: https://docs.google.com/forms/d/e/1FAIpQLSc7g9v-lEEAffCmyG3RTQZSnzVz0GUbF3GWGOa82JAmyP2PCQ/viewform?usp=sharing

        • Requesting input from other consortia, then will advertise

      • Have a candidate script for clearing old data ... needs to be added to crontab still

       


      Software Coordination (John):

      • daq-buildtools v8.0.0 released; contains a DUNEDAQ_DB_PATH environment variable which tells OKS where to look for schema and data files
      • For the next couple of weeks will personally reduce effort on Software Coordination in order to create a program which can flexibly create graphical displays of configurations
        • Will ensure things still run smoothly, plus Andrew will still be contributing
    • 10:00 10:05
      Actions 5m