Muon Department meeting

US/Central
Description
Stakeholders discuss the work and coordination needed for the various tasks of clear out and installation in and through the 30 straight section
document
    • 1
      Announcements
      Speaker: Jerry Annala (AD/Tevatron)
    • 2
      Studies Discussion
    • 3
      Shutdown prep work during studies period
      Speaker: Mr Cons Gattuso (Fermi Lab)
      Slides
    • 4
      Muon Campus Resources
      Presentation by Christine Ader
      Speaker: Jerry Annala (Fermilab AD/Muon)
      Slides