Please read these instructions before posting any event on Fermilab Indico

Indico will be down for a brief server restart on Friday Jan 24th at 5PM CST. The downtime will be 15min at most.

Detector Support System (DSS) Interfaces and Requirements

US/Central
Description

Review / Update of DSS design and interfaces

Update of HV detector elements to reflect warm and cold changes

Proposed drawings / models for warm and cold detector