LBNE Near Site Cost and Schedule Review

US/Central
Fermilab

Fermilab

Description
<style type="text/css"> @font-face { font-family: "Calibri"; }p.MsoNormal, li.MsoNormal, div.MsoNormal { margin: 0in 0in 0.0001pt; font-size: 11pt; font-family: Calibri; }.MsoChpDefault { font-size: 11pt; font-family: Calibri; }div.WordSection1 { page: WordSection1; }</style> Assess the status and adequacy of the cost and schedule based on the conceptual design for LBNE Beamline, Near Detector, and the associated Conventional Facilities (CF) at the Near Site (Fermilab).  This review is to identify areas of weakness, and to recommend actions necessary to bring these elements to the level required for a successful DOE CD-1 review, currently planned for spring 2012.

Further information and background documentation can be accessed from the review web page.
For assistance please contact : Sonya Wright
  • Tuesday, 24 January
    • 08:00 09:00
      Committee Executive Session 1h WH1N

      WH1N

      Fermilab

    • 09:00 09:30
      Welcome and LBNE Overview 30m WH1W

      WH1W

      Fermilab

      Speaker: Elaine McCluskey (Fermilab)
      Slides
    • 09:30 10:00
      Near Site Conventional Facilities 30m WH1W

      WH1W

      Fermilab

      Speaker: Mr Tracy Lundin (Fermilab)
      Slides
    • 10:00 10:15
      Break 15m
    • 10:15 10:45
      Beamline Overview 30m WH1W

      WH1W

      Fermilab

      Speaker: Dr Vaia Papadimitriou (Fermilab)
      Slides
    • 10:45 11:15
      Near Detector Overview 30m WH1W

      WH1W

      Fermilab

      Speaker: Christopher Mauger (LANL)
      Slides
    • 11:15 12:00
      Cost/Schedule Overview 45m WH1W

      WH1W

      Fermilab

      Speaker: Robert O'Sullivan (FNAL)
      Slides
    • 12:00 13:00
      Lunch 1h
    • 13:00 15:15
      Beamline Cost/Schedule: PB, NB WH1N

      WH1N

      Fermilab

      (includes System Integration)

      • 13:00
        Beamline Cost/Schedule Overview 45m
        Speaker: Dr Vaia Papadimitriou (Fermilab)
        Slides
      • 13:45
        Cost/Schedule Methodology 45m
        Speaker: Robert O'Sullivan (FNAL)
        Slides
      • 14:30
        Schedule Walkthrough 30m
        Speaker: Robert O'Sullivan (FNAL)
        Slides
      • 15:00
        Break 15m
    • 13:00 16:15
      CF at Near Site Cost/Schedule: CF WH5NE conFESSional

      WH5NE conFESSional

      Fermilab

      • 13:00
        CF Cost Drivers 30m
        Speaker: Mr Tracy Lundin (Fermilab)
        Slides
      • 13:30
        Cost Traceability Walkthrough 1h 15m
      • 14:45
        Break 15m
      • 15:00
        Schedule Walkthrough 1h 15m
    • 13:00 16:30
      Near Detector Cost/Schedule: ND WH1E

      WH1E

      Fermilab

      • 13:00
        ND Prjt Cntrls, RLS, Cobra 20m
        Speaker: Dan Jones
        Slides
      • 13:20
        Near Detector Cost/Schedule Overview 20m
        Speaker: Christopher Mauger
        Slides
      • 13:40
        Beamline Measurements 20m
        Speaker: Dr Geoffrey Mills (LANL)
        Slides
      • 14:00
        LArTPC Tracker 20m
        Speaker: Glenn Horton-Smith (KSU)
        Slides
      • 14:20
        Neutrino Detector 20m
        Speaker: William Louis (LANL)
        Slides
      • 14:40
        Break 15m
      • 14:55
        Neutrino Detector Magnet 20m
        Speaker: David Lee (LANL)
        Slides
      • 15:15
        DAQ/Computing 20m
        Speaker: Hans Berns
        Slides
      • 15:35
        Discussion 55m
    • 15:15 16:15
      Beamline Cost/Schedule: NB WH7X Racetrack

      WH7X Racetrack

      Fermilab

      (includes System Integration)

      • 15:15
        Remote Handling 15m
        Speaker: Mr Patrick Hurh (FNAL)
        Slides
      • 15:30
        Targetry 15m
        Speaker: Dr Bob Zwaska (Fermilab)
        Slides
      • 15:45
        Target Shield Pile 15m
        Speaker: andy stefanik (fermilab)
        Slides
      • 16:00
        Horns 15m
        Speaker: James Hylen
        Slides
    • 15:15 16:00
      Beamline Cost/Schedule: PB WH1N

      WH1N

      Fermilab

      (includes System Integration)

      • 15:15
        Magnets 15m
        Speaker: Dr Gueorgui Velev (FNAL TD/MS)
        Slides
      • 15:30
        Magnet Power Supplies 15m
        Speaker: Mr Steven Hays (AD E/E Support)
        Slides
      • 15:45
        LCW 15m
        Speaker: Karl Williams (Fermilab)
        Slides
    • 16:30 17:30
      Committee Executive Session 1h WH1N

      WH1N

      Fermilab

    • 17:30 18:00
      Questions from the Committee for the Project 30m WH1N

      WH1N

      Fermilab

  • Wednesday, 25 January
    • 08:00 09:00
      Answers to Questions 1h WH8X

      WH8X

      Fermilab

      Slides
    • 09:00 10:00
      Beamline Cost/Schedule: NB WH8X

      WH8X

      Fermilab

      (includes System Integration)

      • 09:00
        Installation 15m
        Speaker: Rich Andrews
        Slides
      • 09:15
        Cost/Schedule Drilldowns 45m
    • 09:00 10:00
      Beamline Cost/Schedule: PB Linac North Bungalow

      Linac North Bungalow

      Fermilab

      (includes System Integration)

      • 09:00
        Controls 15m
        Speaker: Gregory Vogel (AD/Acc. Controls)
        Slides
      • 09:15
        Cost/Schedule Drilldowns 45m
    • 09:00 10:00
      CF at Near Site Cost/Schedule: CF WH12X

      WH12X

      Fermilab

      • 09:00
        Cost/Schedule Drilldowns 1h
    • 09:00 10:00
      Near Detector Cost/Schedule: ND WH12SW

      WH12SW

      Fermilab

      • 09:00
        Cost/Schedule Drilldowns 1h
    • 10:00 10:15
      Break 15m
    • 10:15 12:00
      Beamline Cost/Schedule: PB, NB WH8X

      WH8X

      Fermilab

      (includes System Integration)

      • 10:15
        Subcommittee Session & Report Writing 1h 45m
    • 10:15 12:00
      CF at Near Site Cost/Schedule: CF WH12X

      WH12X

      Fermilab

      • 10:15
        Subcommittee Session & Report Writing 1h 45m
    • 10:15 12:00
      Near Detector Cost/Schedule: ND WH12SW

      WH12SW

      Fermilab

      • 10:15
        Subcommittee Session & Report Writing 1h 45m
    • 12:00 13:00
      Lunch 1h
    • 13:00 15:00
      Committee Report Writing & Dry Runs 2h WH8X

      WH8X

      Fermilab

    • 15:00 16:00
      Closeout 1h WH8X

      WH8X

      Fermilab