Speakers:
Adam Barcock
(UKRI STFC), Alec Habig
(Univ. of Minnesota Duluth), Alexander Tapper
(Imperial College London), Artur Sztuc
(University College London), Bonnie King
(FNAL), David Cussans
(University of Bristol), Jonathan Hays
(Queen Mary University of London), Joshua Klein, Kurt Biery
(Fermilab), Pierre Lasorak
(Imperial College London), Roland Sipos
(CERN), Stoyan Trilov, Wesley Ketchum
(Fermi National Accelerator Laboratory)
Timing System
Hardware:
FIB v2 ( pre-production ) boards due in Bristol 18/July
MIB v3 (pre-production ) design under way.
I2C link between crate controller and module management uController on MIB v2 still being debugged.
Request for quotes for "DUNE variant" AFCs sent out.
ProtoDUNE:
Clock/timestamp being received by all readout/calibration units on NP04
Return path working on CALCI , CTB and DAPHNE
SSP return path not working. WIBs need updated f/ware
Planning to run "endpoint monitoring service" as soon as possible.
No "show stopping" issues reported so far.....
Restarted 10MHz/1PPS to VD TDE. E-mailed Dario requesting check. No reply yet.
For NP02 we will use splitters with ST (rather than LC connectors) to avoid continual problems with UPC fibres being plugged into APC splitters.
08:45
→
09:00
Activity coordination round table15m
Release coordination
Iceberg
ND test setups
EHN1 integration
SW coordination
Speakers:
Bonnie King
(FNAL), John Freeman, Kurt Biery
(Fermilab), Patrick Dunne
(Imperial College London), Wesley Ketchum
(Fermi National Accelerator Laboratory)
ICEBERG
Run 9 underway with fddaq-4.4.3
Software Coordination (John):
Plan to drop SL7 nightly in a week, consistent with SL7 end-of-life
For v5 line, will combine the `readoutlibs` and `readoutmodules` packages into a `datahandlinglibs` package