Good week overall.
4.5E12 to NuMi.
1E12 to SY.
22 minutes of downtime for the week, mostly misc RF.
Commissioning of the laser notcher continues on the $1D cycles and the system is working well.
Early capture studies and cogging code updates continue.
Requested studies before the shutdown are listed in the accompanying slides. Tan is studies coordinator.