Conveners
Survey & Alignment Aspects of Beamline and machine Components
- Horst Friedsam (FNAL)
Survey & Alignment Aspects of Beamline and machine Components
- Johannes Prenting (DESY)
Horst Friedsam
(FNAL)
09/10/2018, 09:20
Survey & Alignment Aspects of Beamline and Machine Components
Paper
Currently the Fermi National Accelerator Laboratory is transitioning to an institution functioning like CERN to provide the foundation for an International Neutrino research facility. For that a Short and Long Base Line Neutrino program has been established. With the recent installation of the ICARUS detectors the Short Base Line Neutrino (SBN) construction is nearing completion. Over time...
Dr
Virgil Bocean
(Fermi National Accelerator Laboratory)
09/10/2018, 09:45
Survey & Alignment Aspects of Beamline and Machine Components
In the context of today’s global interest in the neutrino research programs, with special emphasis on long baseline neutrino oscillation experiments, the LBNF project at Fermilab receives special attention as the world's highest-intensity neutrino beam to be sent 1,300 kilometres straight through the earth's mantle to the massive high-precision DUNE experiment’s detectors located one mile deep...
Mr
Dominique Missiaen
(CERN)
09/10/2018, 10:45
Survey & Alignment Aspects of Beamline and Machine Components
A number for geodetic activities are in progress to provide the necessary infrastructure for the High Luminosity LHC (HL-LHC) project. The results from these activities will also provide the opportunity to investigate and resolve known anomalies identified in the CERN geodetic reference systems, and related parameters, which would benefit this and future projects.
A new high precision GNSS...
Mr
xiaolong wang
(IHEP)
09/10/2018, 11:15
Survey & Alignment Aspects of Beamline and Machine Components
Paper
China Electron Positron Collider (CEPC) is a huge particle collider aim to measure the precise properties of the Higgs boson, its collide energy will be 240 GEV. The CEPC was first proposed in 2012 and by June 2018 its conceptual design report is finished.
The CEPC mainly includes a 1.6km length Linac and LTB transport line, a 100km booster and a 100 km double-ring in which electron and...
Dr
Helene Mainaud Durand
(CERN)
09/10/2018, 11:45
Survey & Alignment Aspects of Beamline and Machine Components
A Project Implementation Plan for the Compact LInear Collider (CLIC) is under preparation for consideration by the European Strategy Update process. The document will integrate all changes and improvements since the Conceptual Design Report submitted in 2012. One of the technical challenges covered is the pre-alignment of CLIC. This paper presents the final strategy chosen, and more...