LCLS-II 3.9 GHz CM Delta FDR

US/Central
Hermitage (Fermilab Technical Division)

Hermitage

Fermilab Technical Division

Camille Ginsburg (Fermilab), Marc Ross (Fermilab)
Jan 2017 3.9 GHz CM FDR
Review Charge
Reviewers
  • Tuesday, 29 January
    • 1
      Closed Committee Session
    • 2
      Welcome & Safety
      Speaker: Richard Stanek (Fermilab)
    • 3
      Project Management
      Speaker: Camille Ginsburg (Fermilab)
      Slides
    • 4
      QA/QC
      Speaker: Mr Jamie Blowers (Fermilab - Technical Division)
      document
      Slides
    • 5
      Discussion
    • 09:45
      Break
    • 6
      Cryomodule Design
      Speaker: Joshua Kaluzny (Fermilab)
      Slides
    • 7
      Design Verification (Cavities)
      Speaker: Dr Sebastian Aderhold (Fermilab)
      Slides
    • 8
      Design Verification (Components)
      Speaker: Dr Nikolay Solyak (FNAL)
      Slides
    • 9
      Discussion
    • 11:45
      Lunch
    • 10
      Production Readiness
      Speaker: Tug Arkan (Fermilab)
      Slides
    • 11
      Cryomodule Testing
      Speaker: Elvin Harms (Fermilab)
      Slides
    • 12
      Cryomodule Transportation
      Speaker: Brian Hartsell (Fermilab)
      Slides
    • 15:30
      Break
    • 13
      Discussion
    • 18:00
      No-host Dinner
  • Wednesday, 30 January
    • 14
      Cryomodule Acceptance, handling, Transport, Installation at SLAC
      Speaker: Mr Jose Chan (SLAC)
      Slides
    • 15
      Discussion
      0-README
      3.9 GHz CM FDR Recommendations Tracking
      3.9 GHz CM PDR Recommendations Tracking
      Cryomodule requirements map
      Review tracker spreadsheet
    • 11:45
      Lunch
    • 16
      Closed Committee Session
    • 17
      Close Out