Please read these instructions before posting any event on Fermilab Indico

The FERMI(FNAL) network authorization method will be removed on Tuesday, Feb 4th at 5PM CST. See news for more details.

Technical Review Manual TXS

US/Central
Description

The Technical Exchange System (TXS) is an UKRI in-kind contribution to LBNF. UKRI is also providing a target to LBNF. Since the target will be inserted into the LBNF Horn A, there are activities to prototype components and practice the insertion and removal of the target. These procedures will eventually be done remotely due to activation. As part of the design process a dummy target will be inserted and removed from a prototype Horn A using a manual TXS. The results of these tests will be used to refine the design of the target-horn system and the TXS.

DUNE Doc-DB #31083 entry for review material link