650 MHz high beta dressed cavity development status

US/Central
Hermitage (ICB2)

Hermitage

ICB2

Timergali Khabiboulline (FNAL)
06/25/2013 650MHz high beta 5-cell dressed cavity development status meeting
There are minutes attached to this event. Show them.
    • 1
      650 MHz high beta dressed cavity development status and schedule
      Speaker: Timergali Khabiboulline (FNAL)
      Slides
    • 2
      Electro-mechanical properties of 650 MHz beta 0.92 5 cell dressed cavity
      Speaker: Mr Ivan Gonin (FNAL)
      Slides
    • 3
      Helium vessel and tuner design update for high beta 650 MHz cavity
      Speaker: Mr Charles Grimm (FNAL)
      Slides
    • 4
      Cavity to cavity coupling, losses in cavity ends related with 118 mm beam pipe
      Speaker: Dr Andrei Lunin (FNAL)
      Slides